A platform for research: civil engineering, architecture and urbanism
METHOD FOR REPLACING BRIDGE BEARING
To provide a method for replacing a bridge bearing capable of reducing the number of newly installed bearings.SOLUTION: A method for replacing bridge bearing for replacing bearings of a bridge 1 having a plurality of main girders 3, includes performing the following steps: a main girder temporary receiving step of installing main girder provisional means K for temporarily supporting the load of the plurality of main girders 3; an existing bearing removal step of removing an existing bearing 4; a cutting-down step of hacking and cutting-down an upper part of a substructure (abutment 2) of the bridge 1; a new bearing installation step of installing a new bearing 8 in a space opened up by cutting-down in the cutting-down step; and a transverse beam construction step of constructing a transverse beam 9 with the direction intersecting the bridge axis direction as the longer direction in the space opened up by cutting-down in the cutting-down step.SELECTED DRAWING: Figure 5
【課題】新たに設置する新設支承の数を低減することのできる橋梁の支承取替工法を提供する。【解決手段】複数の主桁3を有する橋梁1の支承を取り替える橋梁の支承取替工法において、複数の主桁3の荷重を一時的に支える主桁仮受手段Kを設置する主桁仮受工程と、既設支承4を撤去する既設支承撤去工程と、橋梁1の下部構造(橋台2)の上部を斫り取って切り下げる切下工程と、切下工程で切り下げたスペースに新設支承8を設置する新設支承設置工程と、切下工程で切り下げたスペースに橋軸方向と交わる方向を長手方向とする横梁9を構築する横梁構築工程と、を行う。【選択図】図5
METHOD FOR REPLACING BRIDGE BEARING
To provide a method for replacing a bridge bearing capable of reducing the number of newly installed bearings.SOLUTION: A method for replacing bridge bearing for replacing bearings of a bridge 1 having a plurality of main girders 3, includes performing the following steps: a main girder temporary receiving step of installing main girder provisional means K for temporarily supporting the load of the plurality of main girders 3; an existing bearing removal step of removing an existing bearing 4; a cutting-down step of hacking and cutting-down an upper part of a substructure (abutment 2) of the bridge 1; a new bearing installation step of installing a new bearing 8 in a space opened up by cutting-down in the cutting-down step; and a transverse beam construction step of constructing a transverse beam 9 with the direction intersecting the bridge axis direction as the longer direction in the space opened up by cutting-down in the cutting-down step.SELECTED DRAWING: Figure 5
【課題】新たに設置する新設支承の数を低減することのできる橋梁の支承取替工法を提供する。【解決手段】複数の主桁3を有する橋梁1の支承を取り替える橋梁の支承取替工法において、複数の主桁3の荷重を一時的に支える主桁仮受手段Kを設置する主桁仮受工程と、既設支承4を撤去する既設支承撤去工程と、橋梁1の下部構造(橋台2)の上部を斫り取って切り下げる切下工程と、切下工程で切り下げたスペースに新設支承8を設置する新設支承設置工程と、切下工程で切り下げたスペースに橋軸方向と交わる方向を長手方向とする横梁9を構築する横梁構築工程と、を行う。【選択図】図5
METHOD FOR REPLACING BRIDGE BEARING
橋梁の支承取替工法
SHOJI AKIO (author) / KAKUMOTO SHU (author) / SAITO KOJI (author)
2019-08-08
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
Method of Replacing Bearing for Bridge and Bearing Structure
European Patent Office | 2020
Method of Replacing Bearing for Bridge and Bearing Structure
European Patent Office | 2019
|NON-SLIP ANCHOR SOCKET FOR BRIDGE BEARING AND METHOD FOR REPLACING BRIDGE BEARING USING THE SAME
European Patent Office | 2021
|