FORMATION METHOD
To provide a formation method allowing for reduction of time and labor required for underground work for a new building.SOLUTION: A method for forming an earth retaining wall part 300 necessary for underground work of a new building using an underground wall part 11 provided in the underground of an existing building 100 is provided that includes: a step of forming an inner wall part 31 inside an existing building 100 in a more inner position than the underground wall part 11; and a step of forming an earth retaining wall part 300 composed of the underground wall part 11, an earth retaining wall forming material 32, and an inner wall part 31 by filling the gap between the underground wall part 11 and the inner wall part 31 with the earth retaining wall forming material 32, wherein the step of forming the inner wall part 31 includes a step of forming an SMW (Soil Mixing Wall) continuous wall 311, a step of providing an H steel column 312, and a step of providing a horizontal sheet pile 313.SELECTED DRAWING: Figure 7
【課題】新設建物に関する地下工事に要する時間及び手間を削減することが可能となる形成方法を提供すること。【解決手段】既存建物100の地下に設けられている地下壁部11を用いて、新設建物の地下工事を行うための山留壁部300を形成する形成方法であって、地下壁部11よりも既存建物100の内側に内側壁部31を形成するステップと、地下壁部11と内側壁部31との間の隙間に山留形成材32を充填することにより、地下壁部11、山留形成材32、及び内側壁部31からなる山留壁部300を形成するステップとを含み、内側壁部31を形成するステップは、SMW連続壁311を形成するステップと、H鋼柱312を設けるステップと、横矢板313を設けるステップと、を含む。【選択図】図7
FORMATION METHOD
To provide a formation method allowing for reduction of time and labor required for underground work for a new building.SOLUTION: A method for forming an earth retaining wall part 300 necessary for underground work of a new building using an underground wall part 11 provided in the underground of an existing building 100 is provided that includes: a step of forming an inner wall part 31 inside an existing building 100 in a more inner position than the underground wall part 11; and a step of forming an earth retaining wall part 300 composed of the underground wall part 11, an earth retaining wall forming material 32, and an inner wall part 31 by filling the gap between the underground wall part 11 and the inner wall part 31 with the earth retaining wall forming material 32, wherein the step of forming the inner wall part 31 includes a step of forming an SMW (Soil Mixing Wall) continuous wall 311, a step of providing an H steel column 312, and a step of providing a horizontal sheet pile 313.SELECTED DRAWING: Figure 7
【課題】新設建物に関する地下工事に要する時間及び手間を削減することが可能となる形成方法を提供すること。【解決手段】既存建物100の地下に設けられている地下壁部11を用いて、新設建物の地下工事を行うための山留壁部300を形成する形成方法であって、地下壁部11よりも既存建物100の内側に内側壁部31を形成するステップと、地下壁部11と内側壁部31との間の隙間に山留形成材32を充填することにより、地下壁部11、山留形成材32、及び内側壁部31からなる山留壁部300を形成するステップとを含み、内側壁部31を形成するステップは、SMW連続壁311を形成するステップと、H鋼柱312を設けるステップと、横矢板313を設けるステップと、を含む。【選択図】図7
FORMATION METHOD
形成方法
FUKUDA YOSHIHIRO (author) / SATOUCHI TAKEO (author) / KATO FUMIYASU (author) / FUJITA SHINGO (author)
2019-08-29
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
STRUCTURE FORMATION SYSTEM, STRUCTURE FORMATION METHOD AND STRUCTURE FORMATION PROGRAM
European Patent Office | 2024
|FORMATION SUPPORT SYSTEM, FORMATION SUPPORT METHOD AND FORMATION SUPPORT PROGRAM
European Patent Office | 2023
|STRUCTURE FORMATION METHOD AND STRUCTURE FORMATION SYSTEM