A platform for research: civil engineering, architecture and urbanism
GROUT MATERIAL INJECTION DEVICE AND INJECTION METHOD
To inject a grout material into the foundation ground at the appropriate pressure and volume.SOLUTION: An injection device 100 comprises: an injection unit 10 for injecting a grout material 6 into a boring hole 3b; an optical fiber cable 40 inserted into an observation hole 7 formed in the vertical direction in the foundation ground 1, and distorted with the displacement of an inner wall of the observation hole 7 in the vertical direction; a strain measurement unit 50 for measuring strains at a plurality of positions in the optical fiber cable 40; and a control unit 30 that calculates a displacement amount of the optical fiber cable 40 using the strain measured by the strain measurement unit 50, and controls the injection unit 10 based on the calculated displacement amount.SELECTED DRAWING: Figure 1
【課題】グラウト材を適切な圧力及び量で基礎地盤へ注入する。【解決手段】注入装置100は、ボーリング孔3bにグラウト材6を注入する注入部10と、基礎地盤1に鉛直方向に形成される観測孔7に挿入され、鉛直方向への観測孔7の内壁の変位に伴って歪む光ファイバケーブル40と、光ファイバケーブル40における複数の位置での歪みを計測する歪み計測部50と、歪み計測部50により計測される歪みを用いて光ファイバケーブル40の変位量を算出し、算出された変位量に基づいて注入部10を制御する制御部30と、を備える。【選択図】図1
GROUT MATERIAL INJECTION DEVICE AND INJECTION METHOD
To inject a grout material into the foundation ground at the appropriate pressure and volume.SOLUTION: An injection device 100 comprises: an injection unit 10 for injecting a grout material 6 into a boring hole 3b; an optical fiber cable 40 inserted into an observation hole 7 formed in the vertical direction in the foundation ground 1, and distorted with the displacement of an inner wall of the observation hole 7 in the vertical direction; a strain measurement unit 50 for measuring strains at a plurality of positions in the optical fiber cable 40; and a control unit 30 that calculates a displacement amount of the optical fiber cable 40 using the strain measured by the strain measurement unit 50, and controls the injection unit 10 based on the calculated displacement amount.SELECTED DRAWING: Figure 1
【課題】グラウト材を適切な圧力及び量で基礎地盤へ注入する。【解決手段】注入装置100は、ボーリング孔3bにグラウト材6を注入する注入部10と、基礎地盤1に鉛直方向に形成される観測孔7に挿入され、鉛直方向への観測孔7の内壁の変位に伴って歪む光ファイバケーブル40と、光ファイバケーブル40における複数の位置での歪みを計測する歪み計測部50と、歪み計測部50により計測される歪みを用いて光ファイバケーブル40の変位量を算出し、算出された変位量に基づいて注入部10を制御する制御部30と、を備える。【選択図】図1
GROUT MATERIAL INJECTION DEVICE AND INJECTION METHOD
グラウト材の注入装置及び注入方法
IMAI MICHIO (author) / NASUNO KYONOBU (author) / MATSUMOTO SHINYA (author) / TAKAHASHI KATSUYA (author) / MASUMOTO KAZUHIKO (author) / TOBE HAYATO (author)
2019-10-03
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
GROUT MATERIAL INJECTION METHOD, STRUCTURE REINFORCEMENT METHOD AND GROUT MATERIAL INJECTION DEVICE
European Patent Office | 2024
|GROUT MATERIAL INJECTION MANAGEMENT DEVICE, GROUT MATERIAL INJECTION MANAGEMENT METHOD, AND PROGRAM
European Patent Office | 2023
|INJECTION METHOD OF GROUT MATERIAL, AND INJECTION SUPPORT DEVICE OF GROUT MATERIAL
European Patent Office | 2024
|GROUT MATERIAL INJECTION METHOD AND INJECTION ASSIST DEVICE
European Patent Office | 2022
|