POST-INSTALLED ANCHOR AND DETERIORATION INSPECTION METHOD OF CONCRETE CONSTRUCTION
To provide a post-installed anchor and a concrete construction deterioration inspection method allowing a deterioration check of the anchor to be easily performed in low cost.SOLUTION: An insertion hole 2 having a diameter expansion section 5 the larger in diameter than an opening 3 in a depth side is secured in a formed concrete construction 1. The insertion hole has an elongated anchor bars 11 and an engaging part 12. The anchor bar 11 is inserted in the insertion hole 2, of which a tip projects from the insertion hole 2, comprising markers 7, 8 positioned at a position corresponding with the opening 3 or at a predetermined position on a rear end side further than that of the opening 3 to confirm deterioration of the concrete construction. The engaging part 12 is arranged on a rear part of the anchor bar 11 and is positioned at the diameter expanding section 5. The anchor bar 11 and the engaging part 12 are secured in the insertion hole 2 with adhesive 6.SELECTED DRAWING: Figure 1
【課題】アンカーの劣化を低コストで容易に確認することができるあと施工アンカーおよびコンクリート構造劣化検査方法を提供する。【解決手段】開口3より大径の拡径部5を奥側に有する挿入穴2が形成されたコンクリート構造物1に固定される。細長いアンカー筋11と係合部12とを有する。アンカー筋11は挿入穴2に挿入され、先端が挿入穴2から突出し、開口3と一致する位置または開口3より後端側の所定の位置にコンクリート構造の劣化を確認するための目印7,8を有する。係合部12はアンカー筋11の後部に設けられて拡径部5に配置される。アンカー筋11および係合部12は接着剤6で挿入穴2に固定される。【選択図】図1
POST-INSTALLED ANCHOR AND DETERIORATION INSPECTION METHOD OF CONCRETE CONSTRUCTION
To provide a post-installed anchor and a concrete construction deterioration inspection method allowing a deterioration check of the anchor to be easily performed in low cost.SOLUTION: An insertion hole 2 having a diameter expansion section 5 the larger in diameter than an opening 3 in a depth side is secured in a formed concrete construction 1. The insertion hole has an elongated anchor bars 11 and an engaging part 12. The anchor bar 11 is inserted in the insertion hole 2, of which a tip projects from the insertion hole 2, comprising markers 7, 8 positioned at a position corresponding with the opening 3 or at a predetermined position on a rear end side further than that of the opening 3 to confirm deterioration of the concrete construction. The engaging part 12 is arranged on a rear part of the anchor bar 11 and is positioned at the diameter expanding section 5. The anchor bar 11 and the engaging part 12 are secured in the insertion hole 2 with adhesive 6.SELECTED DRAWING: Figure 1
【課題】アンカーの劣化を低コストで容易に確認することができるあと施工アンカーおよびコンクリート構造劣化検査方法を提供する。【解決手段】開口3より大径の拡径部5を奥側に有する挿入穴2が形成されたコンクリート構造物1に固定される。細長いアンカー筋11と係合部12とを有する。アンカー筋11は挿入穴2に挿入され、先端が挿入穴2から突出し、開口3と一致する位置または開口3より後端側の所定の位置にコンクリート構造の劣化を確認するための目印7,8を有する。係合部12はアンカー筋11の後部に設けられて拡径部5に配置される。アンカー筋11および係合部12は接着剤6で挿入穴2に固定される。【選択図】図1
POST-INSTALLED ANCHOR AND DETERIORATION INSPECTION METHOD OF CONCRETE CONSTRUCTION
あと施工アンカーおよびコンクリート構造劣化検査方法
TANAKA REIJI (author)
2019-10-24
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
POST-INSTALLED ANCHOR, POST-INSTALLED ANCHOR CONSTRUCTION METHOD, AND POST-INSTALLED ANCHOR SYSTEM
European Patent Office | 2016
|European Patent Office | 2017
|ANCHOR CONSTRUCTION CONTROL JIG AND POST-INSTALLED ANCHOR CONSTRUCTION METHOD
European Patent Office | 2017
|European Patent Office | 2015
|European Patent Office | 2016
|