A platform for research: civil engineering, architecture and urbanism
METHOD FOR FORESIGHTED CONTROL OF ROAD FINISHER
To provide a method for controlling a road finisher with improved energy efficiency.SOLUTION: A road finisher having a primary drive unit M, a material hopper and a paving screed 5 with a screed heating system 7 that can be operated by energy generated by the primary drive unit M is controlled. The screed heating system 7 is operated to heat the screed 5 during paving operation of the road finisher by controlling a temperature of the screed to a predetermined screed operating temperature value or to a predetermined screed operating temperature range. The road finisher anticipates a future operating state of increased energy demand of the road finisher. When a future operating state of increased energy demand has been detected, the screed heating system 7 is operated to heat the screed 5 beyond the predetermined screed operating temperature value or the predetermined screed operating temperature range. When the operating state of increased energy demand is reached, the screed heating system 7 is at least temporarily deactivated.SELECTED DRAWING: Figure 2
【課題】エネルギー効率良くロードフィニッシャーを制御する方法を提供する。【解決手段】主駆動部Mと、資材ホッパーと、主駆動部Mにより生成されたエネルギーにより動作可能なスクリード加熱系7を有する舗装スクリード5と、を備えるロードフィニッシャーが制御される。舗装スクリード5の温度を、所定のスクリード動作温度値または所定のスクリード動作温度範囲に制御することで舗装動作中に、舗装スクリード5を加熱するようにスクリード加熱系7を動作する。ロードフィニッシャーは、ロードフィニッシャーのエネルギー需要が増える将来の動作状態を予測する。エネルギー需要が増える将来の動作状態が検出されると、スクリード加熱系7が動作されて、所定のスクリード動作温度値または所定のスクリード動作温度範囲を超えるようにスクリード5を加熱する。エネルギー需要が増える動作状態に達すると、スクリード加熱系7は少なくとも部分的に停止する。【選択図】図2
METHOD FOR FORESIGHTED CONTROL OF ROAD FINISHER
To provide a method for controlling a road finisher with improved energy efficiency.SOLUTION: A road finisher having a primary drive unit M, a material hopper and a paving screed 5 with a screed heating system 7 that can be operated by energy generated by the primary drive unit M is controlled. The screed heating system 7 is operated to heat the screed 5 during paving operation of the road finisher by controlling a temperature of the screed to a predetermined screed operating temperature value or to a predetermined screed operating temperature range. The road finisher anticipates a future operating state of increased energy demand of the road finisher. When a future operating state of increased energy demand has been detected, the screed heating system 7 is operated to heat the screed 5 beyond the predetermined screed operating temperature value or the predetermined screed operating temperature range. When the operating state of increased energy demand is reached, the screed heating system 7 is at least temporarily deactivated.SELECTED DRAWING: Figure 2
【課題】エネルギー効率良くロードフィニッシャーを制御する方法を提供する。【解決手段】主駆動部Mと、資材ホッパーと、主駆動部Mにより生成されたエネルギーにより動作可能なスクリード加熱系7を有する舗装スクリード5と、を備えるロードフィニッシャーが制御される。舗装スクリード5の温度を、所定のスクリード動作温度値または所定のスクリード動作温度範囲に制御することで舗装動作中に、舗装スクリード5を加熱するようにスクリード加熱系7を動作する。ロードフィニッシャーは、ロードフィニッシャーのエネルギー需要が増える将来の動作状態を予測する。エネルギー需要が増える将来の動作状態が検出されると、スクリード加熱系7が動作されて、所定のスクリード動作温度値または所定のスクリード動作温度範囲を超えるようにスクリード5を加熱する。エネルギー需要が増える動作状態に達すると、スクリード加熱系7は少なくとも部分的に停止する。【選択図】図2
METHOD FOR FORESIGHTED CONTROL OF ROAD FINISHER
ロードフィニッシャーの事前制御方法
TOBIAS NOLL (author)
2020-01-09
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE