TEMPORARY SCAFFOLD FORMING JIG AND TEMPORARY SCAFFOLD FORMING METHOD
To provide a temporary scaffold forming jig capable of increasing the aseismatic strength of a temporary scaffold irrespective of a building structure environment, a construction progress, etc.SOLUTION: This temporary scaffold forming jig comprises: a planking 5 that is laid on the ground surface; and a sliding bearing unit 4 that is disposed between a support pillar 2 for supporting a temporary scaffold 1 juxtaposed to a building 6 and the planking 5. The temporary scaffold 1 includes rod-like support pillars 2 at least four of which form one set and a scaffold part 3 provided for each layer with respect to the support pillars 2 so that an operator can come and go along the building 6.SELECTED DRAWING: Figure 1
【課題】建物の構造環境や工事の進捗等に関わらず、仮設足場の耐震強度を高める仮設足場形成冶具の提供。【解決手段】仮設足場形成冶具は、地面に敷設された敷板5と、建物6に併設される仮設足場1を支持する支柱2と敷板5との間に配設された滑り支承体4とを備えている。仮設足場1は、建物6に沿って作業者が往来できるよう、少なくとも4本1組とする棒状の支柱2と、支柱2に対して階層毎に設けられた足場部3とから構成される。【選択図】図1
TEMPORARY SCAFFOLD FORMING JIG AND TEMPORARY SCAFFOLD FORMING METHOD
To provide a temporary scaffold forming jig capable of increasing the aseismatic strength of a temporary scaffold irrespective of a building structure environment, a construction progress, etc.SOLUTION: This temporary scaffold forming jig comprises: a planking 5 that is laid on the ground surface; and a sliding bearing unit 4 that is disposed between a support pillar 2 for supporting a temporary scaffold 1 juxtaposed to a building 6 and the planking 5. The temporary scaffold 1 includes rod-like support pillars 2 at least four of which form one set and a scaffold part 3 provided for each layer with respect to the support pillars 2 so that an operator can come and go along the building 6.SELECTED DRAWING: Figure 1
【課題】建物の構造環境や工事の進捗等に関わらず、仮設足場の耐震強度を高める仮設足場形成冶具の提供。【解決手段】仮設足場形成冶具は、地面に敷設された敷板5と、建物6に併設される仮設足場1を支持する支柱2と敷板5との間に配設された滑り支承体4とを備えている。仮設足場1は、建物6に沿って作業者が往来できるよう、少なくとも4本1組とする棒状の支柱2と、支柱2に対して階層毎に設けられた足場部3とから構成される。【選択図】図1
TEMPORARY SCAFFOLD FORMING JIG AND TEMPORARY SCAFFOLD FORMING METHOD
仮設足場形成冶具及び仮設足場形成方法
KAWAGUCHI TAKAMASA (author)
2020-01-16
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
TEMPORARY SCAFFOLD AND CONSTRUCTION METHOD FOR TEMPORARY SCAFFOLD