SAND CARRYING-OUT EQUIPMENT
To provide sand carrying-out equipment which is unlikely to cause problems.SOLUTION: Sand carrying-out equipment, which is provided in a sedimentation basin 2 in which sands contained in received water are sedimented, comprises: a sand pump 61 which sucks sedimented sands; a sand pipe 64 which is connected to the sand pump 61, and through which sands, which are sucked by the sand pump 61, pass upward; and a transport pipe 66 which extends in a direction crossing the sand pipe 64, and transports sands passed through the sand pipe 64. The sand pipe 64 is provided with a check valve 641 which prevents backflow from the transport pipe 66 to the sand pump 61, and has a portion, which is located above a pipe connection part 66b of the transport pipe 66 with the sand pipe 64, between the check valve 641 and the transport pipe 66.SELECTED DRAWING: Figure 9
【課題】不具合が発生しにくい砂搬出設備を提供する。【解決手段】受け入れた水に含まれている砂が沈降する沈砂池2に設けられる砂搬出設備は、沈降した砂を吸込む揚砂ポンプ61と、揚砂ポンプ61に接続し、揚砂ポンプ61によって吸い込まれた砂が上方側に向かって通過する揚砂管64と、揚砂管64と交わる方向に延在し、揚砂管64を通過した砂を搬送する搬送管66とを備え、揚砂管64は、搬送管66から揚砂ポンプ61への逆流を防止する逆止弁641が設けられ、逆止弁641と搬送管66との間に、搬送管66における、揚砂管64との管接続部分66bよりも上方に配置された部分を有している。【選択図】図9
SAND CARRYING-OUT EQUIPMENT
To provide sand carrying-out equipment which is unlikely to cause problems.SOLUTION: Sand carrying-out equipment, which is provided in a sedimentation basin 2 in which sands contained in received water are sedimented, comprises: a sand pump 61 which sucks sedimented sands; a sand pipe 64 which is connected to the sand pump 61, and through which sands, which are sucked by the sand pump 61, pass upward; and a transport pipe 66 which extends in a direction crossing the sand pipe 64, and transports sands passed through the sand pipe 64. The sand pipe 64 is provided with a check valve 641 which prevents backflow from the transport pipe 66 to the sand pump 61, and has a portion, which is located above a pipe connection part 66b of the transport pipe 66 with the sand pipe 64, between the check valve 641 and the transport pipe 66.SELECTED DRAWING: Figure 9
【課題】不具合が発生しにくい砂搬出設備を提供する。【解決手段】受け入れた水に含まれている砂が沈降する沈砂池2に設けられる砂搬出設備は、沈降した砂を吸込む揚砂ポンプ61と、揚砂ポンプ61に接続し、揚砂ポンプ61によって吸い込まれた砂が上方側に向かって通過する揚砂管64と、揚砂管64と交わる方向に延在し、揚砂管64を通過した砂を搬送する搬送管66とを備え、揚砂管64は、搬送管66から揚砂ポンプ61への逆流を防止する逆止弁641が設けられ、逆止弁641と搬送管66との間に、搬送管66における、揚砂管64との管接続部分66bよりも上方に配置された部分を有している。【選択図】図9
SAND CARRYING-OUT EQUIPMENT
砂搬出設備
KAWAKAMI NAOYA (author) / SUZUKI KENJI (author)
2020-01-23
Patent
Electronic Resource
Japanese
Movement of sand-carrying liquid mixtures along fractures
Engineering Index Backfile | 1958
|European Patent Office | 2024
|Load-Carrying Mechanism of Vertical Plate Anchors in Sand
Online Contents | 2017
|Load-Carrying Mechanism of Vertical Plate Anchors in Sand
Online Contents | 2016
|