AUXILIARY PIPE INSTALLING TOOL AND STANDARD ERECTING STRUCTURE
To provide an auxiliary pipe installing tool which holds an auxiliary pipe for erecting a standard, and a standard erecting structure using the auxiliary pipe installing tool.SOLUTION: An auxiliary pipe installing tool is used while installed on a joint projecting to a side part of a scaffold panel constituting a suspended scaffold, and includes a covering tool covering the joint, and a fastener for fixing the covering tool to the joint. A standard erecting structure is a structure in which a standard is erected on a side part of a scaffold panel constituting a suspended scaffold, in which an auxiliary pipe installing tool is mounted on two or more joints projecting to the side part of the scaffold panel, the auxiliary pipe installing tool is held by one clamp, the auxiliary pipe is held by the other clamp, and two or more standards are erected at intervals on the auxiliary pipe.SELECTED DRAWING: Figure 1
【課題】 建地を立設するための補助パイプを保持する補助パイプ取付け具と、当該補助パイプ取付け具を用いた建地立設構造を提供する。【解決手段】 本発明の補助パイプ取付け具は、吊り足場を構成する足場パネルの側方に突出したジョイントに取り付けて使用するものであって、当該ジョイントに被せる被せ具と、当該被せ具をジョイントに固定する止め具を備えたものである。本発明の建地立設構造は、吊り足場を構成する足場パネルの側方に建地を立設させた構造であって、足場パネルの側方に突出した二以上のジョイントに本発明の補助パイプ取付け具が取り付けられ、当該補助パイプ取付け具がクランプの一方で保持され、当該クランプの他方で補助パイプが保持され、当該補助パイプに二以上の建地が所定間隔をあけて立設されたものである。【選択図】図1
AUXILIARY PIPE INSTALLING TOOL AND STANDARD ERECTING STRUCTURE
To provide an auxiliary pipe installing tool which holds an auxiliary pipe for erecting a standard, and a standard erecting structure using the auxiliary pipe installing tool.SOLUTION: An auxiliary pipe installing tool is used while installed on a joint projecting to a side part of a scaffold panel constituting a suspended scaffold, and includes a covering tool covering the joint, and a fastener for fixing the covering tool to the joint. A standard erecting structure is a structure in which a standard is erected on a side part of a scaffold panel constituting a suspended scaffold, in which an auxiliary pipe installing tool is mounted on two or more joints projecting to the side part of the scaffold panel, the auxiliary pipe installing tool is held by one clamp, the auxiliary pipe is held by the other clamp, and two or more standards are erected at intervals on the auxiliary pipe.SELECTED DRAWING: Figure 1
【課題】 建地を立設するための補助パイプを保持する補助パイプ取付け具と、当該補助パイプ取付け具を用いた建地立設構造を提供する。【解決手段】 本発明の補助パイプ取付け具は、吊り足場を構成する足場パネルの側方に突出したジョイントに取り付けて使用するものであって、当該ジョイントに被せる被せ具と、当該被せ具をジョイントに固定する止め具を備えたものである。本発明の建地立設構造は、吊り足場を構成する足場パネルの側方に建地を立設させた構造であって、足場パネルの側方に突出した二以上のジョイントに本発明の補助パイプ取付け具が取り付けられ、当該補助パイプ取付け具がクランプの一方で保持され、当該クランプの他方で補助パイプが保持され、当該補助パイプに二以上の建地が所定間隔をあけて立設されたものである。【選択図】図1
AUXILIARY PIPE INSTALLING TOOL AND STANDARD ERECTING STRUCTURE
補助パイプ取付け具及び建地立設構造
SAITO KENJI (author)
2020-01-23
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Auxiliary positioning tool for erecting overhanging type steel pipe scaffold
European Patent Office | 2022
|Large steel pipe stand column erecting and installing method
European Patent Office | 2020
|Auxiliary keel installing support, installing structure between auxiliary keels and method
European Patent Office | 2015
|