CONSTRUCTION BUILDING METHOD ON MOUNTAIN AREA
To provide a construction building method affecting natural environment little, being useful for various fields, and allowing a construction period to be shortened when building a construction such as a power line tower at a high altitude site on a mountain area.SOLUTION: A construction building method comprises steps of: constructing a flat vehicle road on an area 22 where a road network allowing trees in a forest between a lowland of a mountain area 1 and a building installation site at a top of a steep slope on a highland of the mountain area to be cut, using a heavy machine 31 equipped with a feller buncher 31a approaching to the top of the mountain area while cutting trees; installing a base of the construction by performing foundation work at the building installation site with a self-travelling foundation work heavy machine after its travel on the constructed road up to the building installation site; carrying materials for building the construction by a wild terrain vehicle loaded with the materials on the constructed road to the building installation site; and building the construction by assembling the carried materials on the base.SELECTED DRAWING: Figure 2
【課題】山岳地の高所に送配電用の鉄塔などの建造物を建造するにあたり、自然環境に与える影響が少なく、多方面に有益でかつ工期の短期化を図る建造物建造方法を提供する。【解決手段】山岳地1の低地から高地の間の山中の急峻な傾斜地の上に位置する建造物設置場所までの間の森林に生える樹木の間伐が行えるよう路網を整備するためのエリア22に、低地からフェラバンチャ31aを搭載した重機31が入山して樹木を伐採しながら平坦な車道を造成するステップと、造成した車道を自走式基礎工事重機が建造物設置場所まで登坂して建造物設置場所にて基礎工事を行い建造物の基礎部を設けるステップと、造成した車道を建造物組み立て用の資材を積載した不整地運搬車が登坂して前記建造物設置場所に運搬するステップと、運搬された資材を基礎部に組み立てて建造物を建造するステップとを有する。【選択図】図2
CONSTRUCTION BUILDING METHOD ON MOUNTAIN AREA
To provide a construction building method affecting natural environment little, being useful for various fields, and allowing a construction period to be shortened when building a construction such as a power line tower at a high altitude site on a mountain area.SOLUTION: A construction building method comprises steps of: constructing a flat vehicle road on an area 22 where a road network allowing trees in a forest between a lowland of a mountain area 1 and a building installation site at a top of a steep slope on a highland of the mountain area to be cut, using a heavy machine 31 equipped with a feller buncher 31a approaching to the top of the mountain area while cutting trees; installing a base of the construction by performing foundation work at the building installation site with a self-travelling foundation work heavy machine after its travel on the constructed road up to the building installation site; carrying materials for building the construction by a wild terrain vehicle loaded with the materials on the constructed road to the building installation site; and building the construction by assembling the carried materials on the base.SELECTED DRAWING: Figure 2
【課題】山岳地の高所に送配電用の鉄塔などの建造物を建造するにあたり、自然環境に与える影響が少なく、多方面に有益でかつ工期の短期化を図る建造物建造方法を提供する。【解決手段】山岳地1の低地から高地の間の山中の急峻な傾斜地の上に位置する建造物設置場所までの間の森林に生える樹木の間伐が行えるよう路網を整備するためのエリア22に、低地からフェラバンチャ31aを搭載した重機31が入山して樹木を伐採しながら平坦な車道を造成するステップと、造成した車道を自走式基礎工事重機が建造物設置場所まで登坂して建造物設置場所にて基礎工事を行い建造物の基礎部を設けるステップと、造成した車道を建造物組み立て用の資材を積載した不整地運搬車が登坂して前記建造物設置場所に運搬するステップと、運搬された資材を基礎部に組み立てて建造物を建造するステップとを有する。【選択図】図2
CONSTRUCTION BUILDING METHOD ON MOUNTAIN AREA
山岳地における建造物建造方法
MIZUNO SHUNJI (author)
2020-04-23
Patent
Electronic Resource
Japanese
Energy Saving Building in Mountain Area
Trans Tech Publications | 2014
|Discussions on Foundation Pit Construction Scheme of Large Building in Mountain Area
Trans Tech Publications | 2014
|Discussions on Foundation Pit Construction Scheme of Large Building in Mountain Area
British Library Conference Proceedings | 2014
|Mountain building decoration gabion curtain wall construction method
European Patent Office | 2021
|