A platform for research: civil engineering, architecture and urbanism
POLE FOR GUARD FENCE AND GUARD FENCE
To provide a pole for a guard fence, and a guard fence capable of securing a clearance limit while suppressing the projection of the pole for the guard fence to the sidewalk to realize smooth passage on a sidewalk, and also securing sufficient shock absorption capacity.SOLUTION: A pole for a guard fence 2 to which the present invention is applied is composed mainly of a front side flange 25, a rear side flange 26, and a connection piece 27, and a horizontal distance H from a front edge Gf of a ground covering concrete G to a forefront surface of a horizontal member 3 has a clearance of 250 mm or more secured therefor, which is a clearance limit. Further, the rearmost surface of the rear side flange 26 is configured not to project to the side of a sidewalk B beyond the imaginary vertical line passing through the rear edge Gt of the ground covering concrete G. This makes it possible to realize smooth passage on the sidewalk while satisfying the clearance limit.SELECTED DRAWING: Figure 2
【課題】建築限界を確保しつつ防護柵用支柱の歩道側への張り出しを抑え、歩道における円滑な通行を実現するとともに、衝撃吸収力を十分に確保することができる防護柵用支柱、及び防護柵を提供することを目的とする。【解決手段】本発明を適用した防護柵用支柱2は、主に前側フランジ25、後側フランジ26、及び連結片27から構成されており、地覆コンクリートGの前縁Gfから横架材3の最前面までの水平距離Hは、建築限界である250mm以上のクリアランスが確保されている。また、後側フランジ26の最背面は、地覆コンクリートGの後縁Gtを通過する仮想鉛直線よりも歩道B側に張り出さない構成となっている。これにより、建築限界を満たしつつ、歩道における円滑な通行を実現することができる。【選択図】図2
POLE FOR GUARD FENCE AND GUARD FENCE
To provide a pole for a guard fence, and a guard fence capable of securing a clearance limit while suppressing the projection of the pole for the guard fence to the sidewalk to realize smooth passage on a sidewalk, and also securing sufficient shock absorption capacity.SOLUTION: A pole for a guard fence 2 to which the present invention is applied is composed mainly of a front side flange 25, a rear side flange 26, and a connection piece 27, and a horizontal distance H from a front edge Gf of a ground covering concrete G to a forefront surface of a horizontal member 3 has a clearance of 250 mm or more secured therefor, which is a clearance limit. Further, the rearmost surface of the rear side flange 26 is configured not to project to the side of a sidewalk B beyond the imaginary vertical line passing through the rear edge Gt of the ground covering concrete G. This makes it possible to realize smooth passage on the sidewalk while satisfying the clearance limit.SELECTED DRAWING: Figure 2
【課題】建築限界を確保しつつ防護柵用支柱の歩道側への張り出しを抑え、歩道における円滑な通行を実現するとともに、衝撃吸収力を十分に確保することができる防護柵用支柱、及び防護柵を提供することを目的とする。【解決手段】本発明を適用した防護柵用支柱2は、主に前側フランジ25、後側フランジ26、及び連結片27から構成されており、地覆コンクリートGの前縁Gfから横架材3の最前面までの水平距離Hは、建築限界である250mm以上のクリアランスが確保されている。また、後側フランジ26の最背面は、地覆コンクリートGの後縁Gtを通過する仮想鉛直線よりも歩道B側に張り出さない構成となっている。これにより、建築限界を満たしつつ、歩道における円滑な通行を実現することができる。【選択図】図2
POLE FOR GUARD FENCE AND GUARD FENCE
防護柵用支柱、及び防護柵
OYAMA MITSUMASA (author)
2020-06-04
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2020
|