A platform for research: civil engineering, architecture and urbanism
TEMPORARY SUPPORT POLE, TELEPHONE POLE REBUILDING SUPPORT DEVICE, AND TELEPHONE POLE REBUILDING METHOD
To provide a temporary support pole that can be easily installed regardless of the state of a structure and can hold and move the structure, a telephone pole rebuilding support device, and a telephone pole rebuilding method.SOLUTION: A temporary support pole 10 includes an outer pipe 11 extending in the radial direction so as to face each other, and provided with a pair of projections 11a that can be held by a holding tool provided at the tip of a crane, a middle tube 12 that is arranged inside the outer pipe 11 and that can be pulled out in the longitudinal direction from the tip of the outer pipe 11, and a base 14 that is connected to the base end of the outer pipe 11 and supports the outer pipe 11 so that the outer pipe 11 can swing.SELECTED DRAWING: Figure 2
【課題】架設物の状態に関わらず容易に設置でき、架線物の把持や移動が可能な仮支持柱、電柱建替支援装置及び電柱建替方法を提供する。【解決手段】仮支持柱10は、互いに対向するように径方向に延び、クレーンの先端に設けられた把持具で把持可能な一対の突起11aを備える外管11と、外管11の内部に配置され、外管11の先端部から長手方向に引き出すことが可能な中管12と、外管11の基端部に接続され、外管11を首振り可能に支持するベース14と、を備える。【選択図】図2
TEMPORARY SUPPORT POLE, TELEPHONE POLE REBUILDING SUPPORT DEVICE, AND TELEPHONE POLE REBUILDING METHOD
To provide a temporary support pole that can be easily installed regardless of the state of a structure and can hold and move the structure, a telephone pole rebuilding support device, and a telephone pole rebuilding method.SOLUTION: A temporary support pole 10 includes an outer pipe 11 extending in the radial direction so as to face each other, and provided with a pair of projections 11a that can be held by a holding tool provided at the tip of a crane, a middle tube 12 that is arranged inside the outer pipe 11 and that can be pulled out in the longitudinal direction from the tip of the outer pipe 11, and a base 14 that is connected to the base end of the outer pipe 11 and supports the outer pipe 11 so that the outer pipe 11 can swing.SELECTED DRAWING: Figure 2
【課題】架設物の状態に関わらず容易に設置でき、架線物の把持や移動が可能な仮支持柱、電柱建替支援装置及び電柱建替方法を提供する。【解決手段】仮支持柱10は、互いに対向するように径方向に延び、クレーンの先端に設けられた把持具で把持可能な一対の突起11aを備える外管11と、外管11の内部に配置され、外管11の先端部から長手方向に引き出すことが可能な中管12と、外管11の基端部に接続され、外管11を首振り可能に支持するベース14と、を備える。【選択図】図2
TEMPORARY SUPPORT POLE, TELEPHONE POLE REBUILDING SUPPORT DEVICE, AND TELEPHONE POLE REBUILDING METHOD
仮支持柱、電柱建替支援装置及び電柱建替方法
TOE NARIYA (author)
2020-06-04
Patent
Electronic Resource
Japanese
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2019
|ASSEMBLED UTILITY POLE, POLE BUILDING METHOD AND REBUILDING METHOD
European Patent Office | 2024
|European Patent Office | 2023
|ELECTRIC POWER LEAD-IN WIRE TEMPORARY SUPPORTING TOOL FOR REBUILDING ELECTRIC POLE
European Patent Office | 2019
|