RECLAMATION MANAGEMENT METHOD AND RECLAMATION MANAGEMENT SYSTEM
To estimate the settlements of both an original ground and a reclamation material to be fed.SOLUTION: Consolidation settlement characteristics and a three-dimensional shape are identified for an original ground G. The physical property of a reclamation material 2 to be fed to a reclamation region A is measured, and consolidation settlement characteristics corresponding to the measured physical property are identified. The settlements of the original ground G and the reclamation material 2 on a designated date are estimated on the basis of the three-dimensional shape of a surface of the original ground G, the deposition shape of the reclamation material 2 fed to the reclamation region A, and the consolidation settlement characteristics corresponding to the fed reclamation material 2.SELECTED DRAWING: Figure 1
【課題】原地盤と投入する埋立材の沈下量をそれぞれ推定する。【解決手段】原地盤Gについて、圧密沈下特性と3次元形状を特定する。埋立領域Aに投入する埋立材2の物性を測定し、測定した物性に対応した圧密沈下特性を特定する。原地盤Gの圧密沈下特性、原地盤Gの表面の3次元形状、埋立領域Aに投入された埋立材2の堆積形状、投入した埋立材2に対応した圧密沈下特性に基づいて、指定された日時における原地盤G及び埋立材2の沈下量を推定する。【選択図】図1
RECLAMATION MANAGEMENT METHOD AND RECLAMATION MANAGEMENT SYSTEM
To estimate the settlements of both an original ground and a reclamation material to be fed.SOLUTION: Consolidation settlement characteristics and a three-dimensional shape are identified for an original ground G. The physical property of a reclamation material 2 to be fed to a reclamation region A is measured, and consolidation settlement characteristics corresponding to the measured physical property are identified. The settlements of the original ground G and the reclamation material 2 on a designated date are estimated on the basis of the three-dimensional shape of a surface of the original ground G, the deposition shape of the reclamation material 2 fed to the reclamation region A, and the consolidation settlement characteristics corresponding to the fed reclamation material 2.SELECTED DRAWING: Figure 1
【課題】原地盤と投入する埋立材の沈下量をそれぞれ推定する。【解決手段】原地盤Gについて、圧密沈下特性と3次元形状を特定する。埋立領域Aに投入する埋立材2の物性を測定し、測定した物性に対応した圧密沈下特性を特定する。原地盤Gの圧密沈下特性、原地盤Gの表面の3次元形状、埋立領域Aに投入された埋立材2の堆積形状、投入した埋立材2に対応した圧密沈下特性に基づいて、指定された日時における原地盤G及び埋立材2の沈下量を推定する。【選択図】図1
RECLAMATION MANAGEMENT METHOD AND RECLAMATION MANAGEMENT SYSTEM
埋立管理方法及び埋立管理システム
KUMAGAI TAKAHIRO (author) / KOTOURA TAKESHI (author)
2020-07-09
Patent
Electronic Resource
Japanese
Solid wastes: reclamation and management
Taylor & Francis Verlag | 1981
|European Patent Office | 2016
|EXISTING PIPE RECLAMATION STRUCTURE AND RECLAMATION METHOD