A platform for research: civil engineering, architecture and urbanism
ROOF FLOOR INSPECTION PORT LID AND ROOF FLOOR INSPECTION HATCH
To provide a roof floor inspection port lid which can shut an inspection port formed at a roof floor of a building to be opened and closed freely and securely prevent rainwater from invading without being blown off or deformed even with strong wind or gusty wind, and a roof floor inspection hatch.SOLUTION: A roof floor inspection port lid 3a is composed of a lid main body 31 and a closing plate 32, and an opening of a predetermined size is formed at approximately the center of the lid main body 31. The closing plate 32 has a rectangular shape which is large enough to cover the entire opening formed in the lid main body 31 in a plan view, and is disposed at a position vertically above the lid main body 31 and separated by a predetermined distance. The closing plate 32 is supported by support pieces 322 provided on the lid main body 31 at predetermined intervals. As air guided from the opening is discharged outside in the horizontal direction from a gap C1 formed by the lid main body 31 and the closing plate 32, a wind pressure acting on the lid main body 31 can be suppressed.SELECTED DRAWING: Figure 3
【課題】建造物の屋上に形成された点検口を開閉自在に閉塞し、強風や突風が吹いても吹き飛ばされたり、変形したりすることがなく、雨水の侵入も確実に防止することができる屋上点検口用蓋、及び屋上点検ハッチを提供する。【解決手段】屋上点検口用蓋3aは、蓋本体31、及び閉塞板32から構成され、蓋本体31の略中央には所定の大きさの開口部が形成されている。閉塞板32は、平面視で蓋本体31に形成された開口部の全体を被覆できる程度の大きさの方形状であって、蓋本体31の鉛直上方に所定の距離だけ離間した位置に配置され、閉塞板32は、蓋本体31に所定の間隔で設置された支持片322により支持されている。開口部から導風された空気は、蓋本体31と閉塞板32により形成された隙間C1から水平方向に向かって外部に放出されるため、蓋本体31に作用する風圧を抑制することができる。【選択図】図3
ROOF FLOOR INSPECTION PORT LID AND ROOF FLOOR INSPECTION HATCH
To provide a roof floor inspection port lid which can shut an inspection port formed at a roof floor of a building to be opened and closed freely and securely prevent rainwater from invading without being blown off or deformed even with strong wind or gusty wind, and a roof floor inspection hatch.SOLUTION: A roof floor inspection port lid 3a is composed of a lid main body 31 and a closing plate 32, and an opening of a predetermined size is formed at approximately the center of the lid main body 31. The closing plate 32 has a rectangular shape which is large enough to cover the entire opening formed in the lid main body 31 in a plan view, and is disposed at a position vertically above the lid main body 31 and separated by a predetermined distance. The closing plate 32 is supported by support pieces 322 provided on the lid main body 31 at predetermined intervals. As air guided from the opening is discharged outside in the horizontal direction from a gap C1 formed by the lid main body 31 and the closing plate 32, a wind pressure acting on the lid main body 31 can be suppressed.SELECTED DRAWING: Figure 3
【課題】建造物の屋上に形成された点検口を開閉自在に閉塞し、強風や突風が吹いても吹き飛ばされたり、変形したりすることがなく、雨水の侵入も確実に防止することができる屋上点検口用蓋、及び屋上点検ハッチを提供する。【解決手段】屋上点検口用蓋3aは、蓋本体31、及び閉塞板32から構成され、蓋本体31の略中央には所定の大きさの開口部が形成されている。閉塞板32は、平面視で蓋本体31に形成された開口部の全体を被覆できる程度の大きさの方形状であって、蓋本体31の鉛直上方に所定の距離だけ離間した位置に配置され、閉塞板32は、蓋本体31に所定の間隔で設置された支持片322により支持されている。開口部から導風された空気は、蓋本体31と閉塞板32により形成された隙間C1から水平方向に向かって外部に放出されるため、蓋本体31に作用する風圧を抑制することができる。【選択図】図3
ROOF FLOOR INSPECTION PORT LID AND ROOF FLOOR INSPECTION HATCH
屋上点検口用蓋、及び屋上点検ハッチ
KOKUBU TSUKASA (author)
2020-08-06
Patent
Electronic Resource
Japanese
FLOOR INSPECTION PORT AND FLOOR INSPECTION PORT CONSTRUCTION METHOD
European Patent Office | 2021
|INSPECTION PORT FOR FLOOR WALL AND INSTALLATION STRUCTURE OF INSPECTION PORT FOR FLOOR WALL
European Patent Office | 2023
|