A platform for research: civil engineering, architecture and urbanism
TELESCOPIC TOWER
To suppress a swinging movement due to lifting and improve installation workability.SOLUTION: A telescopic tower 1 includes a base frame 10, a movable frame 20 capable of moving against the base frame 10, a projection portion 41 provided in the movable frame 20, a pair of guide plates 42 provided on the base frame 10, and a positioning mechanism 50 that positions the projection portion 41 to the guide plate 42. The positioning mechanism 50 includes a plurality of through holes 51, a positioning hole 53, a temporary stop groove 55 provided at a tip end of the guide plate 42, a first pin 56 penetrating the first through hole 51A and arranged across the pair of the temporary stop grooves 55, and a second pin 57 penetrating the through holes 51 other than the first through hole 51 and the pair of the positioning holes 53 and arranged.SELECTED DRAWING: Figure 8
【課題】吊り上げによる揺れ動きを抑制し、設置作業性を向上する。【解決手段】伸縮式タワー1は、基枠10と、基枠10に対して移動可能な可動枠20と、可動枠20に設けられた突出部41と、基枠10に設けられた一対のガイド板42と、ガイド板42に対して突出部41を位置決めする位置決め機構50とを備える。位置決め機構50は、複数の貫通孔51と、位置決め孔53と、ガイド板42の先端に設けられた仮止め溝55と、第1貫通孔51Aを貫通して一対の仮止め溝55に跨がって配置された第1ピン56と、第1貫通孔51以外の貫通孔51及び一対の位置決め孔53を貫通して配置された第2ピン57とを有する。【選択図】図8
TELESCOPIC TOWER
To suppress a swinging movement due to lifting and improve installation workability.SOLUTION: A telescopic tower 1 includes a base frame 10, a movable frame 20 capable of moving against the base frame 10, a projection portion 41 provided in the movable frame 20, a pair of guide plates 42 provided on the base frame 10, and a positioning mechanism 50 that positions the projection portion 41 to the guide plate 42. The positioning mechanism 50 includes a plurality of through holes 51, a positioning hole 53, a temporary stop groove 55 provided at a tip end of the guide plate 42, a first pin 56 penetrating the first through hole 51A and arranged across the pair of the temporary stop grooves 55, and a second pin 57 penetrating the through holes 51 other than the first through hole 51 and the pair of the positioning holes 53 and arranged.SELECTED DRAWING: Figure 8
【課題】吊り上げによる揺れ動きを抑制し、設置作業性を向上する。【解決手段】伸縮式タワー1は、基枠10と、基枠10に対して移動可能な可動枠20と、可動枠20に設けられた突出部41と、基枠10に設けられた一対のガイド板42と、ガイド板42に対して突出部41を位置決めする位置決め機構50とを備える。位置決め機構50は、複数の貫通孔51と、位置決め孔53と、ガイド板42の先端に設けられた仮止め溝55と、第1貫通孔51Aを貫通して一対の仮止め溝55に跨がって配置された第1ピン56と、第1貫通孔51以外の貫通孔51及び一対の位置決め孔53を貫通して配置された第2ピン57とを有する。【選択図】図8
TELESCOPIC TOWER
伸縮式タワー
WADA EIJI (author) / NISHIOKA HIDEKI (author)
2020-08-27
Patent
Electronic Resource
Japanese