CONSTRUCTION METHOD FOR SIMPLE TEMPORARY BRIDGE
To provide a construction method for a simple temporary bridge that can be constructed with improved work safety and construction efficiency.SOLUTION: In a construction method for a simple temporary bridge, a suspension device 50 in which a main girder unit 30 that constitutes a superstructure in span units, a reaction force column 51, a first cable tension member 53, a second cable tension member 54 made of rope, and a safety cable tension member 55 are unitized is used. The main girder unit 30 for extension is supported by the first cable tension member 53 that is stretched between the reaction force column 51 and the existing superstructure by connecting the second cable tension member 54 to the main girder unit 30 for extension that is placed in front of the existing superstructure by a crane, and the second cable tension member 54 which is tensioned by performing the tensioning operation of the second cable tension member 54 on the existing superstructure.SELECTED DRAWING: Figure 1
【課題】作業の安全性と施工効率を高めて施工できる簡易仮橋の架設工法を提供する。【解決手段】簡易仮橋の架設工法であって、スパン単位で上部工を構成する主桁ユニット30と、反力支柱51、第1斜張材53、ロープ製の第2斜張材54、および安全斜張材55とをユニット化した懸架装置50を使用し、既設上部工の前方にクレーンで吊り下げて配置した延長用の主桁ユニット30に第2斜張材54を連結し、反力支柱51と既設上部工の間に張設した第1斜張材53と、既設上部工上で第2斜張材54の緊張操作を行って張設した第2斜張材54とにより、延長用の主桁ユニット30を支持するようにした。【選択図】図1
CONSTRUCTION METHOD FOR SIMPLE TEMPORARY BRIDGE
To provide a construction method for a simple temporary bridge that can be constructed with improved work safety and construction efficiency.SOLUTION: In a construction method for a simple temporary bridge, a suspension device 50 in which a main girder unit 30 that constitutes a superstructure in span units, a reaction force column 51, a first cable tension member 53, a second cable tension member 54 made of rope, and a safety cable tension member 55 are unitized is used. The main girder unit 30 for extension is supported by the first cable tension member 53 that is stretched between the reaction force column 51 and the existing superstructure by connecting the second cable tension member 54 to the main girder unit 30 for extension that is placed in front of the existing superstructure by a crane, and the second cable tension member 54 which is tensioned by performing the tensioning operation of the second cable tension member 54 on the existing superstructure.SELECTED DRAWING: Figure 1
【課題】作業の安全性と施工効率を高めて施工できる簡易仮橋の架設工法を提供する。【解決手段】簡易仮橋の架設工法であって、スパン単位で上部工を構成する主桁ユニット30と、反力支柱51、第1斜張材53、ロープ製の第2斜張材54、および安全斜張材55とをユニット化した懸架装置50を使用し、既設上部工の前方にクレーンで吊り下げて配置した延長用の主桁ユニット30に第2斜張材54を連結し、反力支柱51と既設上部工の間に張設した第1斜張材53と、既設上部工上で第2斜張材54の緊張操作を行って張設した第2斜張材54とにより、延長用の主桁ユニット30を支持するようにした。【選択図】図1
CONSTRUCTION METHOD FOR SIMPLE TEMPORARY BRIDGE
簡易仮橋の架設方法
HONDA SHUICHI (author) / YOSHINO KANAME (author) / MATSUDA ISAO (author) / FUJIWARA HISAKAZU (author)
2020-08-27
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
European Patent Office | 2023
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
European Patent Office | 2020
|