CONCRETE FLOOR SLAB JOINING METHOD
To provide a concrete floor slab joining method that reduces the occurrence of a gap between a filling concrete and reinforcing bars after the filled concrete has hardened.SOLUTION: In a concrete floor slab joining method in which a concrete floor slab is joined through a filling concrete section 30, a filling concrete 31 of the filling concrete section 30 is poured by a filling concrete placement process while a first concrete slab 10 is in service for vehicle traffic, after reinforcing bars 40A are connected to a first joint reinforcement 12 and a second joint reinforcement 22 by a reinforcing bar joining process. Even when the first concrete slab 10 and the first joint reinforcement 12 are displaced due to vehicle traffic, the second joint reinforcement 22 joined to the first joint reinforcement 12 through the reinforcing bars 40A displaces the second joint reinforcement 22 and the cast in place filling concrete 31 following the displacement of the first concrete slab 10. Thus, the occurrence of gaps between the filling concrete 31 and the reinforcing bars of the first joint reinforcement 12 is reduced after the hardening of the filling concrete 31.SELECTED DRAWING: Figure 1
【課題】間詰コンクリートが硬化した後に間詰コンクリートと鉄筋との間の隙間の発生を低減するコンクリート床版の接合方法を提供する。【解決手段】間詰部30を介して接合するコンクリート床版の接合方法で、補強鉄筋連結工程により第1継手鉄筋12と第2継手鉄筋22とに補強鉄筋40Aが連結された後に、第1コンクリート床版10が車両の通行のために供用されているときに、間詰コンクリート打設工程により間詰部30の間詰コンクリート31が打設される。第1コンクリート床版10及び第1継手鉄筋12が車両の通行により変位しても、補強鉄筋40Aを介して第1継手鉄筋12に連結された第2継手鉄筋22により、第2継手鉄筋22及び打設された間詰コンクリート31も第1コンクリート床版10の変位に追随して変位し、間詰コンクリート31の硬化後に間詰コンクリート31と第1継手鉄筋12等の鉄筋との間の隙間の発生が低減される。【選択図】図1
CONCRETE FLOOR SLAB JOINING METHOD
To provide a concrete floor slab joining method that reduces the occurrence of a gap between a filling concrete and reinforcing bars after the filled concrete has hardened.SOLUTION: In a concrete floor slab joining method in which a concrete floor slab is joined through a filling concrete section 30, a filling concrete 31 of the filling concrete section 30 is poured by a filling concrete placement process while a first concrete slab 10 is in service for vehicle traffic, after reinforcing bars 40A are connected to a first joint reinforcement 12 and a second joint reinforcement 22 by a reinforcing bar joining process. Even when the first concrete slab 10 and the first joint reinforcement 12 are displaced due to vehicle traffic, the second joint reinforcement 22 joined to the first joint reinforcement 12 through the reinforcing bars 40A displaces the second joint reinforcement 22 and the cast in place filling concrete 31 following the displacement of the first concrete slab 10. Thus, the occurrence of gaps between the filling concrete 31 and the reinforcing bars of the first joint reinforcement 12 is reduced after the hardening of the filling concrete 31.SELECTED DRAWING: Figure 1
【課題】間詰コンクリートが硬化した後に間詰コンクリートと鉄筋との間の隙間の発生を低減するコンクリート床版の接合方法を提供する。【解決手段】間詰部30を介して接合するコンクリート床版の接合方法で、補強鉄筋連結工程により第1継手鉄筋12と第2継手鉄筋22とに補強鉄筋40Aが連結された後に、第1コンクリート床版10が車両の通行のために供用されているときに、間詰コンクリート打設工程により間詰部30の間詰コンクリート31が打設される。第1コンクリート床版10及び第1継手鉄筋12が車両の通行により変位しても、補強鉄筋40Aを介して第1継手鉄筋12に連結された第2継手鉄筋22により、第2継手鉄筋22及び打設された間詰コンクリート31も第1コンクリート床版10の変位に追随して変位し、間詰コンクリート31の硬化後に間詰コンクリート31と第1継手鉄筋12等の鉄筋との間の隙間の発生が低減される。【選択図】図1
CONCRETE FLOOR SLAB JOINING METHOD
コンクリート床版の接合方法
MINAMI HIROO (author) / FURUICHI KOSUKE (author)
2020-08-31
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2019
|JOINING METHOD OF PRECAST FLOOR SLAB AND JOINING STRUCTURE OF PRECAST FLOOR SLAB
European Patent Office | 2017
|FLOOR SLAB RENEWAL METHOD, FLOOR SLAB JOINING STRUCTURE AND ROAD BRIDGE
European Patent Office | 2018
|