A platform for research: civil engineering, architecture and urbanism
INSTALLATION METHOD OF CORRUGATION GATE AND CORRUGATION GATE
To provide an installation method of a corrugation gate capable of being installed precisely and easily.SOLUTION: In the installation method of a corrugation gate, a plate-like side member 2 is temporarily fastened to at least one end in a width direction (X direction) orthogonal to a direction for damming water of a corrugation gate body 1 for rotating around a predetermined rotation axis 11 and erecting to dam water when water flows in, the corrugation gate body 1 and the side member 2 are arranged at the installation position, concrete 8 for fastening the side member 2 from the outside is poured, and after the concrete 8 is cured, the temporal fastening of the corrugation gate body 1 and the side member 2 is released.SELECTED DRAWING: Figure 5
【課題】精度よくかつ容易に設置することが可能な起伏ゲートの設置方法を提供する。【解決手段】この起伏ゲートの設置方法は、水が流入した場合に所定の回動軸線11周りに回動して起立して水をせき止める起伏ゲート本体1の水をせき止める方向と直交する幅方向(X方向)における少なくとも一方端に板状の側面部材2を仮固定した状態で、起伏ゲート本体1および側面部材2を設置位置に配置し、側面部材2を外側から固定するためのコンクリート8を流し入れ、コンクリート8が硬化した後に、起伏ゲート本体1と側面部材2との仮固定を解除する。【選択図】図5
INSTALLATION METHOD OF CORRUGATION GATE AND CORRUGATION GATE
To provide an installation method of a corrugation gate capable of being installed precisely and easily.SOLUTION: In the installation method of a corrugation gate, a plate-like side member 2 is temporarily fastened to at least one end in a width direction (X direction) orthogonal to a direction for damming water of a corrugation gate body 1 for rotating around a predetermined rotation axis 11 and erecting to dam water when water flows in, the corrugation gate body 1 and the side member 2 are arranged at the installation position, concrete 8 for fastening the side member 2 from the outside is poured, and after the concrete 8 is cured, the temporal fastening of the corrugation gate body 1 and the side member 2 is released.SELECTED DRAWING: Figure 5
【課題】精度よくかつ容易に設置することが可能な起伏ゲートの設置方法を提供する。【解決手段】この起伏ゲートの設置方法は、水が流入した場合に所定の回動軸線11周りに回動して起立して水をせき止める起伏ゲート本体1の水をせき止める方向と直交する幅方向(X方向)における少なくとも一方端に板状の側面部材2を仮固定した状態で、起伏ゲート本体1および側面部材2を設置位置に配置し、側面部材2を外側から固定するためのコンクリート8を流し入れ、コンクリート8が硬化した後に、起伏ゲート本体1と側面部材2との仮固定を解除する。【選択図】図5
INSTALLATION METHOD OF CORRUGATION GATE AND CORRUGATION GATE
起伏ゲートの設置方法および起伏ゲート
KIMURA YUICHIRO (author) / MIYAMOTO KUNIE (author) / NAKAHO KYOICHI (author) / KATSUTA YUKIO (author)
2020-08-31
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1918
|Experimental study on mechanism of rail corrugation using corrugation simulator
British Library Online Contents | 2002
|IuD Bahn | 1994
|