To provide a method of constructing a building that enables work on a stable scaffold.SOLUTION: The method includes: a scaffold installation step of installing a scaffold 1 along an outer circumference of a construction range of a building 5 and providing an intermediate corner brace member 43 at corners in a vertical intermediate portion of the scaffold 1; a first floor part construction step (first skeleton construction step) of constructing a first floor part 55 (first skeleton) below the intermediate corner brace member 43; a first floor part scaffold connecting step (first skeleton scaffold connecting step) of connecting the first floor part 55 and the scaffold 1 with a first floor connecting member 61 (connecting means); an intermediate corner brace member removal step of removing the intermediate corner brace member 43; a second floor part construction step (second skeleton construction step) of constructing a second floor part above the first floor part 55; a second floor part scaffold connecting step (second skeleton scaffold connecting step) of connecting the second floor part and the scaffold 1 with a second floor connecting member (connecting means); and a scaffold dismantling step of disassembling the scaffold 1 and removing the first floor connecting member 61 connecting the first floor part 55 and the scaffold 1 and the second floor connecting member connecting the second floor part and the scaffold 1.SELECTED DRAWING: Figure 4
【課題】安定した足場で作業することができる建物の構築方法を提供する。【解決手段】建物5の構築範囲の外周に沿って足場1を設置し、足場1の上下方向の中間部における角部に中間火打材43を設ける足場設置工程と、中間火打材43よりも下側の1階部分55(第1躯体)を構築する1階部分構築工程(第1躯体構築工程)と、1階部分55と足場1とを1階連結部材61(連結手段)で連結する1階部分足場連結工程(第1躯体足場連結工程)と、中間火打材43を取り外す中間火打材取り外し工程と、1階部分55よりも上側の2階部分を構築する2階部分構築工程(第2躯体構築工程)と、2階部分と足場1とを2階連結部材(連結手段)で連結する2階部分足場連結工程(第2躯体足場連結工程)と、足場1を解体し、1階部分55と足場1とを連結する1階連結部材61、および2階部分と足場1とを連結する2階連結部材を取り外す足場解体工程と、を有する。【選択図】図4
To provide a method of constructing a building that enables work on a stable scaffold.SOLUTION: The method includes: a scaffold installation step of installing a scaffold 1 along an outer circumference of a construction range of a building 5 and providing an intermediate corner brace member 43 at corners in a vertical intermediate portion of the scaffold 1; a first floor part construction step (first skeleton construction step) of constructing a first floor part 55 (first skeleton) below the intermediate corner brace member 43; a first floor part scaffold connecting step (first skeleton scaffold connecting step) of connecting the first floor part 55 and the scaffold 1 with a first floor connecting member 61 (connecting means); an intermediate corner brace member removal step of removing the intermediate corner brace member 43; a second floor part construction step (second skeleton construction step) of constructing a second floor part above the first floor part 55; a second floor part scaffold connecting step (second skeleton scaffold connecting step) of connecting the second floor part and the scaffold 1 with a second floor connecting member (connecting means); and a scaffold dismantling step of disassembling the scaffold 1 and removing the first floor connecting member 61 connecting the first floor part 55 and the scaffold 1 and the second floor connecting member connecting the second floor part and the scaffold 1.SELECTED DRAWING: Figure 4
【課題】安定した足場で作業することができる建物の構築方法を提供する。【解決手段】建物5の構築範囲の外周に沿って足場1を設置し、足場1の上下方向の中間部における角部に中間火打材43を設ける足場設置工程と、中間火打材43よりも下側の1階部分55(第1躯体)を構築する1階部分構築工程(第1躯体構築工程)と、1階部分55と足場1とを1階連結部材61(連結手段)で連結する1階部分足場連結工程(第1躯体足場連結工程)と、中間火打材43を取り外す中間火打材取り外し工程と、1階部分55よりも上側の2階部分を構築する2階部分構築工程(第2躯体構築工程)と、2階部分と足場1とを2階連結部材(連結手段)で連結する2階部分足場連結工程(第2躯体足場連結工程)と、足場1を解体し、1階部分55と足場1とを連結する1階連結部材61、および2階部分と足場1とを連結する2階連結部材を取り外す足場解体工程と、を有する。【選択図】図4
METHOD OF CONSTRUCTING BUILDING
建物の構築方法
MATSUMOTO TAKESHI (author)
2020-10-01
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
BUILDING BLOCK FOR CONSTRUCTING A BUILDING AND METHOD FOR CONSTRUCTING A BUILDING