TEMPORARY COFFERDAM CONSTRUCTION METHOD AND TEMPORARY COFFERDAM BODY
To provide a temporary cofferdam construction method and a temporary cofferdam body which can construct a temporary cofferdam in a state where the going-upstream of seawater is shielded when a weir column of an estuary weir whose gate extends to the side of the weir column is maintained and repaired.SOLUTION: A temporary cofferdam construction method constructs a temporary cofferdam in the periphery of a weir column 1 in an estuary weir 10 having the weir column 1 and a gate 3 extending to the side of the weir column 1 includes: a step A of installing a temporary gate 20 provided in the gate 3 on the side of the weir column 1; a step B of installing a first divided box body 30 on one side in the periphery of the weir column 1; and a step C of opening the gate 3, installing a second divided box body 40 on the other side in the periphery of the weir column 1, and connecting the first divided box body 30 and the second divided box body 40 to form a closed box body 50.SELECTED DRAWING: Figure 13
【課題】堰柱の側方にゲートが延設する河口堰の堰柱の補修や改修に際し、海水の遡上を遮蔽した状態で仮締切りを構築することのできる、仮締切り構築方法と仮締切り体を提供する。【解決手段】堰柱1と、堰柱1の側方に延設するゲート3と、を有する河口堰10において、堰柱1の周囲に仮締切りを構築する、仮締切り構築方法であって、堰柱1の側方において、ゲート3に併設する仮ゲート20を設置するA工程と、堰柱1の周囲の一方側に、第一分割函体30を設置するB工程と、ゲート3を開放して、堰柱1の周囲の他方側に、第二分割函体40を設置し、第一分割函体30と第二分割函体40を接続して締切函体50を形成するC工程とを有する。【選択図】図13
TEMPORARY COFFERDAM CONSTRUCTION METHOD AND TEMPORARY COFFERDAM BODY
To provide a temporary cofferdam construction method and a temporary cofferdam body which can construct a temporary cofferdam in a state where the going-upstream of seawater is shielded when a weir column of an estuary weir whose gate extends to the side of the weir column is maintained and repaired.SOLUTION: A temporary cofferdam construction method constructs a temporary cofferdam in the periphery of a weir column 1 in an estuary weir 10 having the weir column 1 and a gate 3 extending to the side of the weir column 1 includes: a step A of installing a temporary gate 20 provided in the gate 3 on the side of the weir column 1; a step B of installing a first divided box body 30 on one side in the periphery of the weir column 1; and a step C of opening the gate 3, installing a second divided box body 40 on the other side in the periphery of the weir column 1, and connecting the first divided box body 30 and the second divided box body 40 to form a closed box body 50.SELECTED DRAWING: Figure 13
【課題】堰柱の側方にゲートが延設する河口堰の堰柱の補修や改修に際し、海水の遡上を遮蔽した状態で仮締切りを構築することのできる、仮締切り構築方法と仮締切り体を提供する。【解決手段】堰柱1と、堰柱1の側方に延設するゲート3と、を有する河口堰10において、堰柱1の周囲に仮締切りを構築する、仮締切り構築方法であって、堰柱1の側方において、ゲート3に併設する仮ゲート20を設置するA工程と、堰柱1の周囲の一方側に、第一分割函体30を設置するB工程と、ゲート3を開放して、堰柱1の周囲の他方側に、第二分割函体40を設置し、第一分割函体30と第二分割函体40を接続して締切函体50を形成するC工程とを有する。【選択図】図13
TEMPORARY COFFERDAM CONSTRUCTION METHOD AND TEMPORARY COFFERDAM BODY
仮締切り構築方法と仮締切り体
MORII SADAKAZU (author) / MIYATA KOICHI (author)
2020-10-29
Patent
Electronic Resource
Japanese
TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
European Patent Office | 2022
|TEMPORARY COFFERDAM, AND CONSTRUCTION METHOD OF CLOSED TEMPORARY COFFERDAM
European Patent Office | 2021
|TEMPORARY COFFERDAM BODY, AND FORMING METHOD FOR CLOSED TYPE TEMPORARY COFFERDAM BODY
European Patent Office | 2023
|European Patent Office | 2021
|