CONCRETE FLOOR SLABS, FORMATION METHOD FOR CONCRETE FLOOR SLABS, AND REPAIR METHOD FOR CONCRETE FLOOR SLABS
To provide concrete floor slabs that are arranged on a bridge girder, have introduced prestress, and are to be easily repaired by replacing one or some precast slabs, a formation method for such concrete floor slabs, and a repair method for such concrete floor slabs.SOLUTION: Prestress is introduced by a first tendon 31 to a first precast slab group 21 composed of precast slabs, the number of which is predetermined, arranged in an axis direction of a bridge girder 1. To one end of the first tendon 31 fastened to the first precast slab group 21, one end of a second tendon 32 penetrating an adjacently disposed second precast slab group 22 is connected via a connection tool 12. In a state in which tensile force is introduced to the second tendon 32 and the other end is fastened to the second precast slab group, the connection tool 12 is made to abut on a bearing pressure plate 44 fixed on a precast slab 22a, adjacent to the first precast slab group, of the second precast slab group 22.SELECTED DRAWING: Figure 2
【課題】橋桁上に配列され、プレストレスが導入されたコンクリート床版であって、一部のプレキャスト版の取り替えによる補修が容易となるコンクリート床版、このようなコンクリート床版の形成方法及びこのようなコンクリート床版の補修方法を提供する。【解決手段】橋桁1の軸線方向に配列された所定数のプレキャスト版からなる第1のプレキャスト版群21に、第1の緊張材31によってプレストレスが導入されている。第1の緊張材31の第1のプレキャスト版群21に定着された一端に、隣接配置された第2のプレキャスト版群22を貫通する第2の緊張材32の一端が、接続具12を介して接続される。第2の緊張材32に緊張力が導入され、他端が第2のプレキャスト版群に定着された状態で、第2のプレキャスト版群22の第1のプレキャスト版群と隣接するプレキャスト版22aに固定された支圧板44に上記接続具12が当接されている。【選択図】図2
CONCRETE FLOOR SLABS, FORMATION METHOD FOR CONCRETE FLOOR SLABS, AND REPAIR METHOD FOR CONCRETE FLOOR SLABS
To provide concrete floor slabs that are arranged on a bridge girder, have introduced prestress, and are to be easily repaired by replacing one or some precast slabs, a formation method for such concrete floor slabs, and a repair method for such concrete floor slabs.SOLUTION: Prestress is introduced by a first tendon 31 to a first precast slab group 21 composed of precast slabs, the number of which is predetermined, arranged in an axis direction of a bridge girder 1. To one end of the first tendon 31 fastened to the first precast slab group 21, one end of a second tendon 32 penetrating an adjacently disposed second precast slab group 22 is connected via a connection tool 12. In a state in which tensile force is introduced to the second tendon 32 and the other end is fastened to the second precast slab group, the connection tool 12 is made to abut on a bearing pressure plate 44 fixed on a precast slab 22a, adjacent to the first precast slab group, of the second precast slab group 22.SELECTED DRAWING: Figure 2
【課題】橋桁上に配列され、プレストレスが導入されたコンクリート床版であって、一部のプレキャスト版の取り替えによる補修が容易となるコンクリート床版、このようなコンクリート床版の形成方法及びこのようなコンクリート床版の補修方法を提供する。【解決手段】橋桁1の軸線方向に配列された所定数のプレキャスト版からなる第1のプレキャスト版群21に、第1の緊張材31によってプレストレスが導入されている。第1の緊張材31の第1のプレキャスト版群21に定着された一端に、隣接配置された第2のプレキャスト版群22を貫通する第2の緊張材32の一端が、接続具12を介して接続される。第2の緊張材32に緊張力が導入され、他端が第2のプレキャスト版群に定着された状態で、第2のプレキャスト版群22の第1のプレキャスト版群と隣接するプレキャスト版22aに固定された支圧板44に上記接続具12が当接されている。【選択図】図2
CONCRETE FLOOR SLABS, FORMATION METHOD FOR CONCRETE FLOOR SLABS, AND REPAIR METHOD FOR CONCRETE FLOOR SLABS
コンクリート床版、コンクリート床版の形成方法及びコンクリート床版の補修方法
FUJIWARA YASUHISA (author) / NISHIMURA KAZUHIRO (author) / ANDO NAOFUMI (author) / SHIMIZU KOICHIRO (author) / MATSUBARA YOSHIYUKI (author) / NISHINO MOTOYASU (author) / SAKINAKA MINORU (author) / NAKAGAMI SHINJI (author)
2020-12-17
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
CONCRETE FLOOR SLABS AND REPAIR METHOD FOR CONCRETE FLOOR SLABS
European Patent Office | 2020
|Tema Archive | 1987
|Engineering Index Backfile | 1916
|Rapid-Desiccating Concrete for Floor Slabs
British Library Conference Proceedings | 1995
|Deflection of reinforced concrete floor slabs
Engineering Index Backfile | 1963
|