A platform for research: civil engineering, architecture and urbanism
SLAB REINFORCEMENT METHOD OF SIDE FASTENING PC BRIDGE
To provide a slab reinforcement method of side fastening PC bridge which can reliably prevent rush-out accidents due to broken PC steel and enables safe construction in shorter time for lower cost.SOLUTION: In a slab reinforcement method of side fastening PC bridge in which PC steel materials 14 are arranged along a bridge axis right-angle direction Y of an upper floor slab 10 and on which pre-stress is applied, executed are: a reinforcement process for performing reinforcement by installing carbon fibers 2, struts or ribs etc as reinforcing members to counter tensile stress acting on the upper floor slab 10 when prestress of the PC steel materials 14 arranged in the upper floor slab 10 are gone; and a prestress release process for relaxing or releasing prestress applied to the PC steel materials 14.SELECTED DRAWING: Figure 1
【課題】PC鋼材の断裂による飛び出し事故を確実に防止することができるとともに、施工が安全に短時間で安価に行える横締めPC橋の床版補強工法を提供する。【解決手段】上床版部10の橋軸直角方向Yに沿ってPC鋼材14が配置されてプレストレスが付与された横締めPC橋の床版補強工法において、上床版部10に配置されていたPC鋼材14のプレストレスがなくなった際に上床版部10に作用する引張応力に対抗する補強部材として炭素繊維2、ストラット又はリブなどを設置して補強する補強工程と、PC鋼材14に付与されたプレストレスを弛緩又は解除するプレストレス解除工程と、を実行する。【選択図】図1
SLAB REINFORCEMENT METHOD OF SIDE FASTENING PC BRIDGE
To provide a slab reinforcement method of side fastening PC bridge which can reliably prevent rush-out accidents due to broken PC steel and enables safe construction in shorter time for lower cost.SOLUTION: In a slab reinforcement method of side fastening PC bridge in which PC steel materials 14 are arranged along a bridge axis right-angle direction Y of an upper floor slab 10 and on which pre-stress is applied, executed are: a reinforcement process for performing reinforcement by installing carbon fibers 2, struts or ribs etc as reinforcing members to counter tensile stress acting on the upper floor slab 10 when prestress of the PC steel materials 14 arranged in the upper floor slab 10 are gone; and a prestress release process for relaxing or releasing prestress applied to the PC steel materials 14.SELECTED DRAWING: Figure 1
【課題】PC鋼材の断裂による飛び出し事故を確実に防止することができるとともに、施工が安全に短時間で安価に行える横締めPC橋の床版補強工法を提供する。【解決手段】上床版部10の橋軸直角方向Yに沿ってPC鋼材14が配置されてプレストレスが付与された横締めPC橋の床版補強工法において、上床版部10に配置されていたPC鋼材14のプレストレスがなくなった際に上床版部10に作用する引張応力に対抗する補強部材として炭素繊維2、ストラット又はリブなどを設置して補強する補強工程と、PC鋼材14に付与されたプレストレスを弛緩又は解除するプレストレス解除工程と、を実行する。【選択図】図1
SLAB REINFORCEMENT METHOD OF SIDE FASTENING PC BRIDGE
横締めPC橋の床版補強工法
TOYODA YUSUKE (author) / HARADA TAKUYA (author) / OGATA TATSUO (author) / SHOJI AKIO (author) / TAKAHASHI KENICHI (author)
2021-03-01
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
Slab-connected partition wall with fastening reinforcement structure applied
European Patent Office | 2022
|BRIDGE CAP AND FASTENING UNIT FOR FASTENING A BRIDGE CAP
European Patent Office | 2017
|Bridge cap and fastening unit for fastening a bridge cap
European Patent Office | 2019
|