SUBGRADE REINFORCEMENT WORK METHOD AND COVER MEMBER
To provide a subgrade reinforcement work method in which, when excavating a paved road to expose one side edge of a first resin sheet member along with the other side in the width direction of the subgrade, damage to the first resin sheet member can be prevented.SOLUTION: A subgrade reinforcement work method is a method of laying a first resin sheet member 10 on one side of a subgrade 6 in the width direction of a paved road 2 and a second resin sheet member on the other side of the subgrade 6 in the width direction to reinforce the subgrade 6. The subgrade reinforcement work method comprises the steps of: excavating the paved road 2 to expose one side of the subgrade 6 in the width direction; laying the first resin sheet member 10 on the upper surface of one side of the exposed subgrade 6 in the width direction, and also bending one side edge 10a of the first resin sheet member 10 located on the center side in the width direction of paved road 2 upward; and attaching the cover member 14 to the one-sided edge 10a of the bent first resin sheet member 10.SELECTED DRAWING: Figure 6
【課題】舗装道路を掘削して路盤の幅方向他側部分と共に第1の樹脂製シート部材の片側縁部を露出させる際に、第1の樹脂製シート部材の損傷を防止することができる路盤補強工法を提供する。【解決手段】路盤補強工法は、舗装道路2の路盤6の幅方向片側部分に第1の樹脂製シート部材10を敷設すると共に路盤6の幅方向他側部分に第2の樹脂製シート部材を敷設して路盤6を補強する工法である。路盤補強工法は、舗装道路2を掘削して路盤6の幅方向片側部分を露出させる工程と、露出させた路盤6の幅方向片側部分の上面に第1の樹脂製シート部材10を敷設すると共に、舗装道路2の幅方向中央側に位置する第1の樹脂製シート部材10の片側縁部10aを上方に向かって折り曲げる工程と、折り曲げた第1の樹脂製シート部材10の片側縁部10aにカバー部材14を装着させる工程とを含む。【選択図】図6
SUBGRADE REINFORCEMENT WORK METHOD AND COVER MEMBER
To provide a subgrade reinforcement work method in which, when excavating a paved road to expose one side edge of a first resin sheet member along with the other side in the width direction of the subgrade, damage to the first resin sheet member can be prevented.SOLUTION: A subgrade reinforcement work method is a method of laying a first resin sheet member 10 on one side of a subgrade 6 in the width direction of a paved road 2 and a second resin sheet member on the other side of the subgrade 6 in the width direction to reinforce the subgrade 6. The subgrade reinforcement work method comprises the steps of: excavating the paved road 2 to expose one side of the subgrade 6 in the width direction; laying the first resin sheet member 10 on the upper surface of one side of the exposed subgrade 6 in the width direction, and also bending one side edge 10a of the first resin sheet member 10 located on the center side in the width direction of paved road 2 upward; and attaching the cover member 14 to the one-sided edge 10a of the bent first resin sheet member 10.SELECTED DRAWING: Figure 6
【課題】舗装道路を掘削して路盤の幅方向他側部分と共に第1の樹脂製シート部材の片側縁部を露出させる際に、第1の樹脂製シート部材の損傷を防止することができる路盤補強工法を提供する。【解決手段】路盤補強工法は、舗装道路2の路盤6の幅方向片側部分に第1の樹脂製シート部材10を敷設すると共に路盤6の幅方向他側部分に第2の樹脂製シート部材を敷設して路盤6を補強する工法である。路盤補強工法は、舗装道路2を掘削して路盤6の幅方向片側部分を露出させる工程と、露出させた路盤6の幅方向片側部分の上面に第1の樹脂製シート部材10を敷設すると共に、舗装道路2の幅方向中央側に位置する第1の樹脂製シート部材10の片側縁部10aを上方に向かって折り曲げる工程と、折り曲げた第1の樹脂製シート部材10の片側縁部10aにカバー部材14を装着させる工程とを含む。【選択図】図6
SUBGRADE REINFORCEMENT WORK METHOD AND COVER MEMBER
路盤補強工法およびカバー部材
HIRONAKA JUNICHI (author) / OGAWA RYOTA (author) / KIMURA SOSUKE (author) / SUZUKI KAZUNARI (author)
2021-03-11
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2015
|Pavement Subgrade Stabilization Using Geogrid Reinforcement
British Library Conference Proceedings | 2001
|Geotextiles as Reinforcement to Weak Subgrade
British Library Conference Proceedings | 1992
|Geosynthetic Subgrade Reinforcement under Construction Camp
British Library Conference Proceedings | 1998
|