A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF WALL PANEL
To dispense with strict management of installation accuracy of a large amount of pull bolts used so that a lower end of a wall panel is fixed to a concrete skeleton part, and improve site workability.SOLUTION: A construction method of a wall panel 1, which fixes a lower end of a wall pane 1 made of a woody material to a concrete skeleton part 2 with fixing means A having a pull bolt 3 resisting against a pull-out force and an anchor 4 resisting against a shear force, embeds a sheath pipe 7 for forming a loose hole 6 having a larger diameter than that of the pull bolt 3 in an arrangement corresponding part of the pull bolt 3 in construction of the concrete skeleton part 2, inserts the pull bolt 3 to the sheath pipe 7 in construction of the wall panel 1 after curing the concrete skeleton part 2, and fixes the pull bolt 3 to the concrete skeleton part 2 by a dry method using the sheath pipe 7.SELECTED DRAWING: Figure 1
【課題】壁パネルの下端をコンクリート躯体部に定着するために用いられる大量の引きボルトの設置精度の厳密な管理を不要化し、現場施工性の改善を図る。【解決手段】木質材料製の壁パネル1の下端を、引き抜き力に抵抗する引きボルト3及びせん断力に抵抗するアンカー4を備えた固定手段Aにてコンクリート躯体部2に固定する壁パネル1の建て込み工法であって、コンクリート躯体部2の構築時に、引きボルト3の配置相当箇所に当該引きボルト3よりも大径のルーズ孔6を形成するシース管7を埋め込んでおき、コンクリート躯体部2の硬化後における壁パネル1の建て込み時に、引きボルト3をシース管7に挿入し、シース管7を利用して引きボルト3をコンクリート躯体部2に乾式工法で固定してある。【選択図】図1
CONSTRUCTION METHOD OF WALL PANEL
To dispense with strict management of installation accuracy of a large amount of pull bolts used so that a lower end of a wall panel is fixed to a concrete skeleton part, and improve site workability.SOLUTION: A construction method of a wall panel 1, which fixes a lower end of a wall pane 1 made of a woody material to a concrete skeleton part 2 with fixing means A having a pull bolt 3 resisting against a pull-out force and an anchor 4 resisting against a shear force, embeds a sheath pipe 7 for forming a loose hole 6 having a larger diameter than that of the pull bolt 3 in an arrangement corresponding part of the pull bolt 3 in construction of the concrete skeleton part 2, inserts the pull bolt 3 to the sheath pipe 7 in construction of the wall panel 1 after curing the concrete skeleton part 2, and fixes the pull bolt 3 to the concrete skeleton part 2 by a dry method using the sheath pipe 7.SELECTED DRAWING: Figure 1
【課題】壁パネルの下端をコンクリート躯体部に定着するために用いられる大量の引きボルトの設置精度の厳密な管理を不要化し、現場施工性の改善を図る。【解決手段】木質材料製の壁パネル1の下端を、引き抜き力に抵抗する引きボルト3及びせん断力に抵抗するアンカー4を備えた固定手段Aにてコンクリート躯体部2に固定する壁パネル1の建て込み工法であって、コンクリート躯体部2の構築時に、引きボルト3の配置相当箇所に当該引きボルト3よりも大径のルーズ孔6を形成するシース管7を埋め込んでおき、コンクリート躯体部2の硬化後における壁パネル1の建て込み時に、引きボルト3をシース管7に挿入し、シース管7を利用して引きボルト3をコンクリート躯体部2に乾式工法で固定してある。【選択図】図1
CONSTRUCTION METHOD OF WALL PANEL
壁パネルの建て込み方法
MITANI TAKASHI (author) / ASANO MITSUO (author) / NAKAJIMA KEISUKE (author) / SUZUKI YUYA (author)
2021-06-03
Patent
Electronic Resource
Japanese
WALL PANEL CONSTRUCTION JIG AND WALL PANEL CONSTRUCTION METHOD
European Patent Office | 2022
|EXTERIOR WALL PANEL AND CONSTRUCTION METHOD OF EXTERIOR WALL PANEL
European Patent Office | 2020
|