A platform for research: civil engineering, architecture and urbanism
JOINT STRUCTURE OF STEEL PIPE POLE
To solve the problem in which, in the case where a tubular member such as a square steel pipe pole is joined using bolt joint, construction is not easy since it has a closed cross-sectional shape.SOLUTION: A joint structure of steel pipe pole includes: a first diaphragm provided at one end of a first steel pipe pole; a first L-shaped flange and a second L-shaped flange joined to the surface of the first diaphragm; a second diaphragm provided at one end of a second steel pipe pole; a third L-shaped flange and a fourth L-shaped flange joined to the surface of the second diaphragm; and a first splice plate and a second splice plate. The first steel pipe pole and the second steel pipe pole are arranged in the vertical direction. The first L-shaped flange and the second L-shaped flange are arranged being separated from each other. The third L-shaped flange and the fourth L-shaped flange are arranged being separated from each other. The first L-shaped flange and the third L-shaped flange are bolt-joined via the first splice plate, and the second L-shaped flange and the fourth L-shaped flange are bolt-joined via the second splice plate.SELECTED DRAWING: Figure 1
【課題】 角形鋼管柱のような管状の部材をボルト接合で繋ぐ場合、閉じた断面形状を有しているため施工が容易でないという問題がある。【解決手段】 鋼管柱の継手構造は、第1の鋼管柱の一端に設けられた第1のダイアフラムと、第1のダイアフラムの面に接合された第1のL形フランジ及び第2のL形フランジと、第2の鋼管柱の一端に設けられた第2のダイアフラムと、第2のダイアフラムの面に接合された第3のL形フランジ及び第4のL形フランジと、第1の添え板と第2の添え板と、を含む。第1の鋼管柱と第2の鋼管柱とは上下方向に配置され、第1のL形フランジと第2のL形フランジとは離隔して配置され、第3のL形フランジと第4のL形フランジとは離隔して配置され、第1のL形フランジと第3のL形フランジとは、第1の添え板を介してボルト接合され、第2のL形フランジと第4のL形フランジとは、第2の添え板を介してボルト接合されている。【選択図】図1
JOINT STRUCTURE OF STEEL PIPE POLE
To solve the problem in which, in the case where a tubular member such as a square steel pipe pole is joined using bolt joint, construction is not easy since it has a closed cross-sectional shape.SOLUTION: A joint structure of steel pipe pole includes: a first diaphragm provided at one end of a first steel pipe pole; a first L-shaped flange and a second L-shaped flange joined to the surface of the first diaphragm; a second diaphragm provided at one end of a second steel pipe pole; a third L-shaped flange and a fourth L-shaped flange joined to the surface of the second diaphragm; and a first splice plate and a second splice plate. The first steel pipe pole and the second steel pipe pole are arranged in the vertical direction. The first L-shaped flange and the second L-shaped flange are arranged being separated from each other. The third L-shaped flange and the fourth L-shaped flange are arranged being separated from each other. The first L-shaped flange and the third L-shaped flange are bolt-joined via the first splice plate, and the second L-shaped flange and the fourth L-shaped flange are bolt-joined via the second splice plate.SELECTED DRAWING: Figure 1
【課題】 角形鋼管柱のような管状の部材をボルト接合で繋ぐ場合、閉じた断面形状を有しているため施工が容易でないという問題がある。【解決手段】 鋼管柱の継手構造は、第1の鋼管柱の一端に設けられた第1のダイアフラムと、第1のダイアフラムの面に接合された第1のL形フランジ及び第2のL形フランジと、第2の鋼管柱の一端に設けられた第2のダイアフラムと、第2のダイアフラムの面に接合された第3のL形フランジ及び第4のL形フランジと、第1の添え板と第2の添え板と、を含む。第1の鋼管柱と第2の鋼管柱とは上下方向に配置され、第1のL形フランジと第2のL形フランジとは離隔して配置され、第3のL形フランジと第4のL形フランジとは離隔して配置され、第1のL形フランジと第3のL形フランジとは、第1の添え板を介してボルト接合され、第2のL形フランジと第4のL形フランジとは、第2の添え板を介してボルト接合されている。【選択図】図1
JOINT STRUCTURE OF STEEL PIPE POLE
鋼管柱の継手構造
TAHARA KENICHI (author) / SASAKI SATOSHI (author) / SUZUKI YUKIE (author)
2021-06-10
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS