A platform for research: civil engineering, architecture and urbanism
SILL STRUCTURE AND SILL CONSTRUCTION METHOD
To provide a sill structure and sill construction method in which construction is easy and construction time can be shortened even if a constructor is not an expert.SOLUTION: A sill structure has a foundation 1, an anchor bolt 2, and a sill 3. A lower part of the anchor bolt 2 is inserted into and fixed to the foundation 1. The sill 3 has a through hole 31 having an inner diameter larger than a diameter of the anchor bolt 2. The sill 3 is supported by an upper part of the foundation 1 by inserting an upper part of the anchor bolt 2 into the through hole 31. The sill 3 is fixed to the foundation 1 with a nut 4 that is screwed with the anchor bolt 2. An elastic material 5 capable of absorbing the vibration of the anchor bolt 2 is filled and solidified in the gap between the sill 3 of the through hole 31 and the anchor bolt 2. The elastic material 5 is formed by mixing boric acid with a silicon resin.SELECTED DRAWING: Figure 1
【課題】熟練者でなくても施工が容易で施工時間を短縮可能な土台構造および土台施工方法を提供する。【解決手段】基礎1と、アンカーボルト2と、土台3とを有する。アンカーボルト2は下部が基礎1に挿入固定されている。土台3はアンカーボルト2の径より大きい内径の貫通孔31を有する。土台3は、貫通孔31にアンカーボルト2の上部を挿入させて基礎1の上部で支持される。土台3は、アンカーボルト2と螺合するナット4で基礎1に固定される。貫通孔31の土台3とアンカーボルト2との間隙にアンカーボルト2の振動を吸収可能な弾性材5が充填固化されている。弾性材5はシリコン樹脂にホウ酸を混合して成る。【選択図】図1
SILL STRUCTURE AND SILL CONSTRUCTION METHOD
To provide a sill structure and sill construction method in which construction is easy and construction time can be shortened even if a constructor is not an expert.SOLUTION: A sill structure has a foundation 1, an anchor bolt 2, and a sill 3. A lower part of the anchor bolt 2 is inserted into and fixed to the foundation 1. The sill 3 has a through hole 31 having an inner diameter larger than a diameter of the anchor bolt 2. The sill 3 is supported by an upper part of the foundation 1 by inserting an upper part of the anchor bolt 2 into the through hole 31. The sill 3 is fixed to the foundation 1 with a nut 4 that is screwed with the anchor bolt 2. An elastic material 5 capable of absorbing the vibration of the anchor bolt 2 is filled and solidified in the gap between the sill 3 of the through hole 31 and the anchor bolt 2. The elastic material 5 is formed by mixing boric acid with a silicon resin.SELECTED DRAWING: Figure 1
【課題】熟練者でなくても施工が容易で施工時間を短縮可能な土台構造および土台施工方法を提供する。【解決手段】基礎1と、アンカーボルト2と、土台3とを有する。アンカーボルト2は下部が基礎1に挿入固定されている。土台3はアンカーボルト2の径より大きい内径の貫通孔31を有する。土台3は、貫通孔31にアンカーボルト2の上部を挿入させて基礎1の上部で支持される。土台3は、アンカーボルト2と螺合するナット4で基礎1に固定される。貫通孔31の土台3とアンカーボルト2との間隙にアンカーボルト2の振動を吸収可能な弾性材5が充填固化されている。弾性材5はシリコン樹脂にホウ酸を混合して成る。【選択図】図1
SILL STRUCTURE AND SILL CONSTRUCTION METHOD
土台構造および土台施工方法
SUMORI AKIRA (author)
2021-08-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STRUCTURE OF DOOR SILL, CONSTRUCTION METHOD FOR DOOR SILL, AND FIXING MEMBER FOR DOOR SILL
European Patent Office | 2023
|