CONCRETE FILLING STEEL PIPE MATERIAL
To provide a concrete filling steel pipe material which can be manufactured in significantly low cost and can be applied without problems to a steel pipe of such a diameter as not to allow the entering of a welding operator.SOLUTION: The concrete filling steel pipe material is constituted of: a steel pipe 2; a blocking plate 3 blocking both ends of the steel pipe 2; and filling concrete 4 filled in the steel pie 2. A perforated steel plate dowel 32 in a shape protruding toward the other end side of the steel pipe 2 inside of the steel pipe 2, engaging with the surrounding filling concrete 4 and capable of restraining a displacement of the filling concrete 4 in a longitudinal direction of the steel pipe 2 is fixed to the blocking plate 3, both ends of the cured filling concrete 4 are restrained by the steal pipe 2 via the blocking plate 3 by integrating with the perforated steel plate dowel 32 inside of the steel pipe 2.SELECTED DRAWING: Figure 1
【課題】極めて安価なコストで製造することができ、溶接作業者が進入できない径の鋼管に対しても問題なく適用することができるコンクリート充填鋼管材を提供する。【解決手段】鋼管2と、鋼管2の両端部を閉塞する閉塞板3と、鋼管2内に充填された充填コンクリート4とによって構成され、閉塞板3には、鋼管2の内部において鋼管2の他端側へ向かって突出し、周囲の充填コンクリート4と係合して、鋼管2の長手方向への充填コンクリート4のずれを拘束できる形状の孔あき鋼板ジベル32が固定され、硬化した充填コンクリート4の両端部が、鋼管2の内部において孔あき鋼板ジベル32と一体化することにより、閉塞板3を介して鋼管2に拘束されていることを特徴としている。【選択図】図1
CONCRETE FILLING STEEL PIPE MATERIAL
To provide a concrete filling steel pipe material which can be manufactured in significantly low cost and can be applied without problems to a steel pipe of such a diameter as not to allow the entering of a welding operator.SOLUTION: The concrete filling steel pipe material is constituted of: a steel pipe 2; a blocking plate 3 blocking both ends of the steel pipe 2; and filling concrete 4 filled in the steel pie 2. A perforated steel plate dowel 32 in a shape protruding toward the other end side of the steel pipe 2 inside of the steel pipe 2, engaging with the surrounding filling concrete 4 and capable of restraining a displacement of the filling concrete 4 in a longitudinal direction of the steel pipe 2 is fixed to the blocking plate 3, both ends of the cured filling concrete 4 are restrained by the steal pipe 2 via the blocking plate 3 by integrating with the perforated steel plate dowel 32 inside of the steel pipe 2.SELECTED DRAWING: Figure 1
【課題】極めて安価なコストで製造することができ、溶接作業者が進入できない径の鋼管に対しても問題なく適用することができるコンクリート充填鋼管材を提供する。【解決手段】鋼管2と、鋼管2の両端部を閉塞する閉塞板3と、鋼管2内に充填された充填コンクリート4とによって構成され、閉塞板3には、鋼管2の内部において鋼管2の他端側へ向かって突出し、周囲の充填コンクリート4と係合して、鋼管2の長手方向への充填コンクリート4のずれを拘束できる形状の孔あき鋼板ジベル32が固定され、硬化した充填コンクリート4の両端部が、鋼管2の内部において孔あき鋼板ジベル32と一体化することにより、閉塞板3を介して鋼管2に拘束されていることを特徴としている。【選択図】図1
CONCRETE FILLING STEEL PIPE MATERIAL
コンクリート充填鋼管材
YONEDA TATSUNORI (author) / KURIYAMA HIROSHI (author)
2021-08-05
Patent
Electronic Resource
Japanese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente