A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION TOOL OF STEEL SHEET PILE WALL AND CONSTRUCTION METHOD THEREOF
To provide a construction tool allowing quick and easy work of guiding a steel sheet pile to a prescribed construction position and connecting to a steel sheet pile placed in advance.SOLUTION: A construction tool of a steel sheet pile wall is used for connecting a second steel sheet pile hung down by a crane to a first steel sheet pile forming part of a steel sheet pile wall placed in the ground. The construction tool has an engaging part detachably engaged with a plate-like part of the first steel sheet pile, a long part with at least a part thereof extended, in the extended direction of the steel sheet pile wall, to a position allowing contact with the second steel sheet pile arranged at a horizontal position connectable to the first steel sheet pile, and a column part which is detachably engaged with the engaging part and holds the long part at a prescribed height from an upper end of the first steel sheet plate.SELECTED DRAWING: Figure 1
【課題】鋼矢板を所定の施工位置まで誘導して先に打設された鋼矢板に連結する作業を迅速かつ容易にする。【解決手段】地盤に打設され鋼矢板壁の一部を構成する第1の鋼矢板に、クレーンで吊り下げられた第2の鋼矢板を連結するための鋼矢板壁の施工治具であって、第1の鋼矢板の板状部分に着脱可能に係止される係止部と、少なくとも一部が鋼矢板壁の延長方向に、第1の鋼矢板に連結可能な水平位置に配置された第2の鋼矢板に接触可能な位置まで延びる長尺部と、係止部に着脱可能に連結され、長尺部を第1の鋼矢板の上端から所定の高さに保持する柱部とを備える鋼矢板壁の施工治具が提供される。【選択図】図1
CONSTRUCTION TOOL OF STEEL SHEET PILE WALL AND CONSTRUCTION METHOD THEREOF
To provide a construction tool allowing quick and easy work of guiding a steel sheet pile to a prescribed construction position and connecting to a steel sheet pile placed in advance.SOLUTION: A construction tool of a steel sheet pile wall is used for connecting a second steel sheet pile hung down by a crane to a first steel sheet pile forming part of a steel sheet pile wall placed in the ground. The construction tool has an engaging part detachably engaged with a plate-like part of the first steel sheet pile, a long part with at least a part thereof extended, in the extended direction of the steel sheet pile wall, to a position allowing contact with the second steel sheet pile arranged at a horizontal position connectable to the first steel sheet pile, and a column part which is detachably engaged with the engaging part and holds the long part at a prescribed height from an upper end of the first steel sheet plate.SELECTED DRAWING: Figure 1
【課題】鋼矢板を所定の施工位置まで誘導して先に打設された鋼矢板に連結する作業を迅速かつ容易にする。【解決手段】地盤に打設され鋼矢板壁の一部を構成する第1の鋼矢板に、クレーンで吊り下げられた第2の鋼矢板を連結するための鋼矢板壁の施工治具であって、第1の鋼矢板の板状部分に着脱可能に係止される係止部と、少なくとも一部が鋼矢板壁の延長方向に、第1の鋼矢板に連結可能な水平位置に配置された第2の鋼矢板に接触可能な位置まで延びる長尺部と、係止部に着脱可能に連結され、長尺部を第1の鋼矢板の上端から所定の高さに保持する柱部とを備える鋼矢板壁の施工治具が提供される。【選択図】図1
CONSTRUCTION TOOL OF STEEL SHEET PILE WALL AND CONSTRUCTION METHOD THEREOF
鋼矢板壁の施工治具および鋼矢板壁の施工方法
NAKAYAMA HIROAKI (author) / TAKENO MASAKAZU (author) / HARADA NORIYOSHI (author) / KITAMURA TAKUYA (author) / YOKOYAMA HIROYASU (author) / NOJI ISAO (author) / YOSHIMARU AKIYOSHI (author)
2021-08-10
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|European Patent Office | 2015
|