A platform for research: civil engineering, architecture and urbanism
CLINKER-BUILT CONSTRUCTION STRUCTURE
To provide a clinker-built construction structure capable of preventing a building plate from fluttering due to wind.SOLUTION: In a clinker-built construction structure 1 constructed by zigzag clinker-built, a support 5 fixed together with a fixture 4 for fixing a lower stage building board 2a to a substrate 3 is hooked to the lower edge of an upper stage building plate 2b. The support 5 supports both right and left end parts at the lower edge of the upper stage building plate 2b and has a support part along the lower surface of the upper stage building plate 2b and a hook part projecting from the support part along the surface of the upper stage building plate 2a. The thickness of the upper stage building board 2a is 0.5 cm or more and 1 cm or less, the thickness of the hook part is 0.05 cm or more and 0.3 cm or less, and the length of the hook part in the projecting direction is 0.2 cm or more and 5 cm or less.SELECTED DRAWING: Figure 1
【課題】風にあおられて建築板がばたつくことを抑える鎧張り施工構造を提供する。【解決手段】千鳥の鎧張りで施工される鎧張り施工構造1であって、下段の建築板2aを下地3に固定する固定具4で共に固定された支持具5が、上段の建築板2bの下端に引っ掛かっている。支持具5は、上段の建築板2bの下端における左右両端部を支持し、上段の建築板2bの下面に沿う支持部、支持部から上段の建築板2aの表面に沿うように突出した引っ掛け部を有する。上段の建築板2aの厚みは、0.5cm以上1cm以下であり、引っ掛け部の厚みは0.05cm以上0.3cm以下であり、引っ掛け部の突出方向の長さは0.2cm以上5cm以下である。【選択図】図1
CLINKER-BUILT CONSTRUCTION STRUCTURE
To provide a clinker-built construction structure capable of preventing a building plate from fluttering due to wind.SOLUTION: In a clinker-built construction structure 1 constructed by zigzag clinker-built, a support 5 fixed together with a fixture 4 for fixing a lower stage building board 2a to a substrate 3 is hooked to the lower edge of an upper stage building plate 2b. The support 5 supports both right and left end parts at the lower edge of the upper stage building plate 2b and has a support part along the lower surface of the upper stage building plate 2b and a hook part projecting from the support part along the surface of the upper stage building plate 2a. The thickness of the upper stage building board 2a is 0.5 cm or more and 1 cm or less, the thickness of the hook part is 0.05 cm or more and 0.3 cm or less, and the length of the hook part in the projecting direction is 0.2 cm or more and 5 cm or less.SELECTED DRAWING: Figure 1
【課題】風にあおられて建築板がばたつくことを抑える鎧張り施工構造を提供する。【解決手段】千鳥の鎧張りで施工される鎧張り施工構造1であって、下段の建築板2aを下地3に固定する固定具4で共に固定された支持具5が、上段の建築板2bの下端に引っ掛かっている。支持具5は、上段の建築板2bの下端における左右両端部を支持し、上段の建築板2bの下面に沿う支持部、支持部から上段の建築板2aの表面に沿うように突出した引っ掛け部を有する。上段の建築板2aの厚みは、0.5cm以上1cm以下であり、引っ掛け部の厚みは0.05cm以上0.3cm以下であり、引っ掛け部の突出方向の長さは0.2cm以上5cm以下である。【選択図】図1
CLINKER-BUILT CONSTRUCTION STRUCTURE
鎧張り施工構造
NISHIDA TOSHIBUMI (author) / OSAKAKI HIROSHI (author)
2021-08-30
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Clinker brick in road construction
Engineering Index Backfile | 1935
|Construction method of cement clinker warehouse roof supporting structure
European Patent Office | 2022
|CLINKER SILO: Construction methodology of a 24-m diameter clinker silo at Bhilai
Online Contents | 2010
|