To provide a tremie pipe guide rail which can smoothly insert and pull out a tremie pipe into a pile hole of a cast-in-place pile in which an underground piled column is built, thereby preventing an increase in construction cost.SOLUTION: A guide rail 12 is provided along a side of a vertical underground piled column 22, extending in a long and narrow direction, and has a rail section at the center of its length that is arranged to span over the tip of a protruding portion 24 that protrudes from the side of the underground piled column 22, and a fixed section at both ends of the length of the guide rail that is fixed at positions on the side of the underground piled column 22, above and below the protruding portion 24, respectively, at a predetermined distance apart. A guide portion is provided between both end portions of the rail portion 12 and the respective fixing portions so as to be inclined from the tip end portion of the projecting portion 24 toward the side surface of the underground piled column 22.SELECTED DRAWING: Figure 1
【課題】構真柱が建て込まれた場所打ち杭の杭孔に対するトレミー管の挿入と引き抜きをスムーズに行うことができ、それにより、施工コストが増加することを防止することができるトレミー管ガイドレールを提供する。【解決手段】上下方向に伸びる構真柱22の側面に沿って、細長く伸びるように設けられるガイドレール12であって、その長さ中央部に、構真柱22の側面から突出する突出部の先端部24の上を架け渡すように配置されるレール部が設けられ、その長さ両端部に、構真柱22の側面の、突出部24の上方及び下方にそれぞれ所定の距離をおいて離れた位置にそれぞれ固定される固定部が設けられ、レール部12の両端部とそれぞれの固定部の間に、突出部24の先端部から構真柱22の側面に向かって傾斜するガイド部が設けられている。【選択図】図1
To provide a tremie pipe guide rail which can smoothly insert and pull out a tremie pipe into a pile hole of a cast-in-place pile in which an underground piled column is built, thereby preventing an increase in construction cost.SOLUTION: A guide rail 12 is provided along a side of a vertical underground piled column 22, extending in a long and narrow direction, and has a rail section at the center of its length that is arranged to span over the tip of a protruding portion 24 that protrudes from the side of the underground piled column 22, and a fixed section at both ends of the length of the guide rail that is fixed at positions on the side of the underground piled column 22, above and below the protruding portion 24, respectively, at a predetermined distance apart. A guide portion is provided between both end portions of the rail portion 12 and the respective fixing portions so as to be inclined from the tip end portion of the projecting portion 24 toward the side surface of the underground piled column 22.SELECTED DRAWING: Figure 1
【課題】構真柱が建て込まれた場所打ち杭の杭孔に対するトレミー管の挿入と引き抜きをスムーズに行うことができ、それにより、施工コストが増加することを防止することができるトレミー管ガイドレールを提供する。【解決手段】上下方向に伸びる構真柱22の側面に沿って、細長く伸びるように設けられるガイドレール12であって、その長さ中央部に、構真柱22の側面から突出する突出部の先端部24の上を架け渡すように配置されるレール部が設けられ、その長さ両端部に、構真柱22の側面の、突出部24の上方及び下方にそれぞれ所定の距離をおいて離れた位置にそれぞれ固定される固定部が設けられ、レール部12の両端部とそれぞれの固定部の間に、突出部24の先端部から構真柱22の側面に向かって傾斜するガイド部が設けられている。【選択図】図1
TREMIE PIPE GUIDE RAIL
トレミー管のガイドレール
KITAHIRA AKIHIKO (author)
2021-09-02