CONSTRUCTION HISTORY INFORMATION MANAGEMENT SYSTEM
To provide a construction history information management system that can complete arithmetic processing without delay according to a characteristic of generated data from a time a server receives acquired data.SOLUTION: A server 201 classifies acquired data captured in a database 202 into one of a plurality of categories including a first category and a second category based on a characteristic of data; and when a load index value indicating a load of the server 201 exceeds a predetermined load threshold value, the server outputs an instruction to a vehicle-mounted controller 110 which has transmitted the acquired data classified into the first category among a plurality of vehicle-mounted controllers 110, while the instruction changes an upload interval of the acquired data classified into the first category from a first time to a second time longer than the first time.SELECTED DRAWING: Figure 4
【課題】サーバが収集データを受信した時点から生成データの特性に合わせて遅滞なく演算処理を完了できる施工履歴情報管理システムを提供すること。【解決手段】サーバ201は、データベース202に取り込まれた収集データをそのデータ特性に基づいて、第1カテゴリ及び第2カテゴリを含む複数のカテゴリのいずれかのカテゴリに分類し、サーバ201の負荷を示す負荷指標値が所定の負荷閾値を超えたとき、第1カテゴリに分類された収集データのアップロード間隔を第1時間から前記第1時間よりも長い第2時間に変更する指令を、複数の車載コントローラ110のうち第1カテゴリに分類された収集データを送信した車載コントローラ110に出力する。【選択図】 図4
CONSTRUCTION HISTORY INFORMATION MANAGEMENT SYSTEM
To provide a construction history information management system that can complete arithmetic processing without delay according to a characteristic of generated data from a time a server receives acquired data.SOLUTION: A server 201 classifies acquired data captured in a database 202 into one of a plurality of categories including a first category and a second category based on a characteristic of data; and when a load index value indicating a load of the server 201 exceeds a predetermined load threshold value, the server outputs an instruction to a vehicle-mounted controller 110 which has transmitted the acquired data classified into the first category among a plurality of vehicle-mounted controllers 110, while the instruction changes an upload interval of the acquired data classified into the first category from a first time to a second time longer than the first time.SELECTED DRAWING: Figure 4
【課題】サーバが収集データを受信した時点から生成データの特性に合わせて遅滞なく演算処理を完了できる施工履歴情報管理システムを提供すること。【解決手段】サーバ201は、データベース202に取り込まれた収集データをそのデータ特性に基づいて、第1カテゴリ及び第2カテゴリを含む複数のカテゴリのいずれかのカテゴリに分類し、サーバ201の負荷を示す負荷指標値が所定の負荷閾値を超えたとき、第1カテゴリに分類された収集データのアップロード間隔を第1時間から前記第1時間よりも長い第2時間に変更する指令を、複数の車載コントローラ110のうち第1カテゴリに分類された収集データを送信した車載コントローラ110に出力する。【選択図】 図4
CONSTRUCTION HISTORY INFORMATION MANAGEMENT SYSTEM
施工履歴情報管理システム
SHIBAO MINETAKA (author) / SAKAMOTO HIROSHI (author)
2021-09-27
Patent
Electronic Resource
Japanese
IPC:
G08G
Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs
,
TRAFFIC CONTROL SYSTEMS
/
E02F
Baggern
,
DREDGING
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
European Patent Office | 2019
|European Patent Office | 2020
|