A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION WORK SUPPORTING SYSTEM AND CONSTRUCTION WORK SUPPORTING METHOD
To improve efficiency of scaffolding building works in a construction site.SOLUTION: A construction work supporting system 10 supports works in a construction site. A scaffolding information storing unit 120A stores scaffolding information including multiple kinds of scaffolding configurations. A point cloud data obtaining unit 122 obtains three-dimensional point cloud data of the construction site via a laser scanner. A data comparing unit 124 compares a BIM model that is three-dimensional design data of a construction object and the three-dimensional point cloud data. A scaffolding information presenting unit 126 extracts scaffolding information related to the contents of works to be conducted in the construction site in the future based on a comparison result provided by the data comparing unit 124, and shows it to workers who engage in the works in the construction site.SELECTED DRAWING: Figure 2
【課題】建設現場における足場の設置作業の効率を向上させる。【解決手段】建設作業支援システム10は、建設現場における作業を支援する。足場情報記憶部120Aは、複数種類の足場の形状を含む足場情報を記憶する。点群データ取得部122は、レーザスキャナにより建設現場の3次元点群データを取得する。データ比較部124は、建設対象物の3次元設計データであるBIMモデルと3次元点群データとを比較する。足場情報提示部126は、データ比較部124の比較結果に基づいて、建設現場で今後実施される作業内容と関連する足場情報を抽出し、建設現場での作業に従事する作業員に提示する。【選択図】図2
CONSTRUCTION WORK SUPPORTING SYSTEM AND CONSTRUCTION WORK SUPPORTING METHOD
To improve efficiency of scaffolding building works in a construction site.SOLUTION: A construction work supporting system 10 supports works in a construction site. A scaffolding information storing unit 120A stores scaffolding information including multiple kinds of scaffolding configurations. A point cloud data obtaining unit 122 obtains three-dimensional point cloud data of the construction site via a laser scanner. A data comparing unit 124 compares a BIM model that is three-dimensional design data of a construction object and the three-dimensional point cloud data. A scaffolding information presenting unit 126 extracts scaffolding information related to the contents of works to be conducted in the construction site in the future based on a comparison result provided by the data comparing unit 124, and shows it to workers who engage in the works in the construction site.SELECTED DRAWING: Figure 2
【課題】建設現場における足場の設置作業の効率を向上させる。【解決手段】建設作業支援システム10は、建設現場における作業を支援する。足場情報記憶部120Aは、複数種類の足場の形状を含む足場情報を記憶する。点群データ取得部122は、レーザスキャナにより建設現場の3次元点群データを取得する。データ比較部124は、建設対象物の3次元設計データであるBIMモデルと3次元点群データとを比較する。足場情報提示部126は、データ比較部124の比較結果に基づいて、建設現場で今後実施される作業内容と関連する足場情報を抽出し、建設現場での作業に従事する作業員に提示する。【選択図】図2
CONSTRUCTION WORK SUPPORTING SYSTEM AND CONSTRUCTION WORK SUPPORTING METHOD
建設作業支援システムおよび建設作業支援方法
KUBOTA YOSHITSUNE (author) / SHINODA JIRO (author)
2021-10-07
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
CONSTRUCTION WORK SUPPORTING SYSTEM AND CONSTRUCTION WORK SUPPORTING METHOD
European Patent Office | 2021
|CONSTRUCTION WORK SUPPORTING SYSTEM AND CONSTRUCTION WORK SUPPORTING METHOD
European Patent Office | 2021
|European Patent Office | 2015
|European Patent Office | 2021
|