A platform for research: civil engineering, architecture and urbanism
SLOPE BLOCK PILING-UP METHOD
To provide a slope block piling-up method that can improve efficiency of a work to transport a plurality of slope blocks to an installation position.SOLUTION: A slope block piling-up method comprises: a step (S1) to install two guide rails 10 on a slope A so as to vertically extend in parallel with each other and be spaced away at an interval L; a step (S2) to install a mounting section 20, which has a mounting surface 21 on which a plurality of slope blocks B can be horizontally arranged and mounted and is guided at both ends by two guide rails 10 so as to be vertically movable, so that the mounting section horizontally bridges two guide rails 10; a step (S3) to mount a plurality of blocks B on the mounting surface 21; a step (S4) to move up the mounting surface 20 along two guide rails 10; a step (S5) to place a plurality of slope blocks B mounted on the mounting surface 21 onto the slope A; and a step (S6) to pile up the slope blocks B on the slope A.SELECTED DRAWING: Figure 4
【課題】複数個の法面ブロックを設置位置まで搬送する作業の効率向上を図ることが可能な法面ブロックの積み上げ方法を提供する。【解決手段】法面ブロックの積み上げ方法は、間隔Lを開けて互いに平行に上下方向に延びるように2本のガイドレール10を法面Aに設置する工程(S1)と、法面ブロックBを複数個水平方向に並べて載置することが可能な載置面21を有し、2本のガイドレール10に両端部がそれぞれ上下動自在に案内される載置部20を、2本のガイドレール10に水平方向にわたるように設ける工程(S2)と、載置面21に複数個の法面ブロックBを載置する工程(S3)と、載置部20を2本のガイドレール10に沿って上昇させる工程(S4)と、載置面21に載置されている複数個の法面ブロックBを法面A上に降す工程(S5)と、降した法面ブロックBを法面A上に積み上げる工程(S6)とを備える。【選択図】図4
SLOPE BLOCK PILING-UP METHOD
To provide a slope block piling-up method that can improve efficiency of a work to transport a plurality of slope blocks to an installation position.SOLUTION: A slope block piling-up method comprises: a step (S1) to install two guide rails 10 on a slope A so as to vertically extend in parallel with each other and be spaced away at an interval L; a step (S2) to install a mounting section 20, which has a mounting surface 21 on which a plurality of slope blocks B can be horizontally arranged and mounted and is guided at both ends by two guide rails 10 so as to be vertically movable, so that the mounting section horizontally bridges two guide rails 10; a step (S3) to mount a plurality of blocks B on the mounting surface 21; a step (S4) to move up the mounting surface 20 along two guide rails 10; a step (S5) to place a plurality of slope blocks B mounted on the mounting surface 21 onto the slope A; and a step (S6) to pile up the slope blocks B on the slope A.SELECTED DRAWING: Figure 4
【課題】複数個の法面ブロックを設置位置まで搬送する作業の効率向上を図ることが可能な法面ブロックの積み上げ方法を提供する。【解決手段】法面ブロックの積み上げ方法は、間隔Lを開けて互いに平行に上下方向に延びるように2本のガイドレール10を法面Aに設置する工程(S1)と、法面ブロックBを複数個水平方向に並べて載置することが可能な載置面21を有し、2本のガイドレール10に両端部がそれぞれ上下動自在に案内される載置部20を、2本のガイドレール10に水平方向にわたるように設ける工程(S2)と、載置面21に複数個の法面ブロックBを載置する工程(S3)と、載置部20を2本のガイドレール10に沿って上昇させる工程(S4)と、載置面21に載置されている複数個の法面ブロックBを法面A上に降す工程(S5)と、降した法面ブロックBを法面A上に積み上げる工程(S6)とを備える。【選択図】図4
SLOPE BLOCK PILING-UP METHOD
法面ブロックの積み上げ方法
MURANAKA HIROAKI (author) / MATSUO SHIGENOSUKE (author) / TANAKA YUMIHIKO (author) / MORIYA HIROANI (author) / MURANO MITSUHIDE (author)
2021-10-07
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cross-Piling Interlocking Type Wave Dissipating Block and Piling Method Therefor
European Patent Office | 2024
|Photovoltaic pile foundation piling equipment for high slope
European Patent Office | 2024
|