CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE, AND RETAINING WALL STRUCTURE
To quickly construct a retaining wall structure in a weak ground.SOLUTION: A construction method of a retaining wall structure 1 includes steps of: driving a foundation pile 3 into a ground 102 (S11); disposing a plurality of retaining wall blocks 2 containing a retaining wall bottom portion 21 and a wall portion 22 that are in contact with a ground surface 101 and having an L-shaped cross section (S15); disposing a reinforced cage 41 in an inter-wall portion 24 which is formed between side faces 21a of the retaining wall bottom portions 21 in the neighboring retaining walls 2 and in which a head portion of the foundation pile 3 is disposed (S16); and forming a footing 4 by installing concrete so as to fill in the foundation pile 3 and the reinforced cage 41 in the inter-wall portion 24 (S17).SELECTED DRAWING: Figure 2
【課題】軟弱な地盤に迅速に擁壁構造を施工する。【解決手段】擁壁構造1を施工する方法は、地盤102に基礎杭3を打つ工程(S11)と、地表面101に接する擁壁底部21と壁部22とを含む断面形状がL字型である擁壁ブロック2を複数配置する工程(S15)と、互いに隣接する擁壁ブロック2における擁壁底部21の側面21aの間に形成されると共に基礎杭3の頭部が配置される壁間部24に、鉄筋かご41を配置する工程(S16)と、壁間部24において基礎杭3及び鉄筋かご41を埋め込むようにコンクリートを打設することによって、フーチング4を形成する工程(S17)と、を有する。【選択図】図2
CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE, AND RETAINING WALL STRUCTURE
To quickly construct a retaining wall structure in a weak ground.SOLUTION: A construction method of a retaining wall structure 1 includes steps of: driving a foundation pile 3 into a ground 102 (S11); disposing a plurality of retaining wall blocks 2 containing a retaining wall bottom portion 21 and a wall portion 22 that are in contact with a ground surface 101 and having an L-shaped cross section (S15); disposing a reinforced cage 41 in an inter-wall portion 24 which is formed between side faces 21a of the retaining wall bottom portions 21 in the neighboring retaining walls 2 and in which a head portion of the foundation pile 3 is disposed (S16); and forming a footing 4 by installing concrete so as to fill in the foundation pile 3 and the reinforced cage 41 in the inter-wall portion 24 (S17).SELECTED DRAWING: Figure 2
【課題】軟弱な地盤に迅速に擁壁構造を施工する。【解決手段】擁壁構造1を施工する方法は、地盤102に基礎杭3を打つ工程(S11)と、地表面101に接する擁壁底部21と壁部22とを含む断面形状がL字型である擁壁ブロック2を複数配置する工程(S15)と、互いに隣接する擁壁ブロック2における擁壁底部21の側面21aの間に形成されると共に基礎杭3の頭部が配置される壁間部24に、鉄筋かご41を配置する工程(S16)と、壁間部24において基礎杭3及び鉄筋かご41を埋め込むようにコンクリートを打設することによって、フーチング4を形成する工程(S17)と、を有する。【選択図】図2
CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE, AND RETAINING WALL STRUCTURE
擁壁構造を施工する方法及び擁壁構造
TAMADA KOICHI (author) / NAKAMURA KANATO (author)
2022-01-11
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
RETAINING WALL STRUCTURE, AND CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE
European Patent Office | 2024
|RETAINING WALL STRUCTURE AND CONSTRUCTION METHOD FOR RETAINING WALL
European Patent Office | 2020
|CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE, AND RETAINING WALL STRUCTURE
European Patent Office | 2024
|RETAINING WALL STRUCTURE AND CONSTRUCTION METHOD OF THE RETAINING WALL STRUCTURE
European Patent Office | 2017
|Highway subgrade retaining wall structure and retaining wall construction method
European Patent Office | 2024
|