A platform for research: civil engineering, architecture and urbanism
TREMIE PIPE, AND CONSTRUCTION METHOD OF CONCRETE PILE
To provide a construction method of a cast-in-place concrete pile in which concrete can be poured to an outside of a reinforced cage without using a vibrator when constructing a concrete pile, and to provide a tremie pipe.SOLUTION: A reinforced cage 24 is built into a pile hole 21 excavated in a ground 20, a tremie pipe 1 is built inside the reinforced cage 24, and concrete 25 is installed in order from a lower part of the pile hole 21. When installing the concrete 25 in the vicinity of an upper part of the reinforced cage 24, by vertically moving the tremie pipe 1, a ring-like protrusion 11 provided in a pipe body 10 becomes in contact with aggregate 26, the concrete 25 is stirred, and the concrete 25 is poured to an outside of the reinforced cage 24.SELECTED DRAWING: Figure 7
【課題】コンクリート杭の施工に際して、バイブレータを用いずに鉄筋かごの外側までコンクリートを流し込めるようにする場所打ちコンクリート杭の構築方法、並びにトレミー管を提供する。【解決手段】地盤20に掘削した杭孔21に鉄筋かご24を建て込み、鉄筋かご24の内側にトレミー管1を立て込み、杭孔21の下部から順にコンクリート25を打設する。鉄筋かご24の上部近傍でコンクリート25を打設する際、トレミー管1を上下動させると管本体10に設けられたリング状突出部11が骨材26と接触し、コンクリート25が攪拌されて鉄筋かご24の外側までコンクリート25が流れ込む。【選択図】図7
TREMIE PIPE, AND CONSTRUCTION METHOD OF CONCRETE PILE
To provide a construction method of a cast-in-place concrete pile in which concrete can be poured to an outside of a reinforced cage without using a vibrator when constructing a concrete pile, and to provide a tremie pipe.SOLUTION: A reinforced cage 24 is built into a pile hole 21 excavated in a ground 20, a tremie pipe 1 is built inside the reinforced cage 24, and concrete 25 is installed in order from a lower part of the pile hole 21. When installing the concrete 25 in the vicinity of an upper part of the reinforced cage 24, by vertically moving the tremie pipe 1, a ring-like protrusion 11 provided in a pipe body 10 becomes in contact with aggregate 26, the concrete 25 is stirred, and the concrete 25 is poured to an outside of the reinforced cage 24.SELECTED DRAWING: Figure 7
【課題】コンクリート杭の施工に際して、バイブレータを用いずに鉄筋かごの外側までコンクリートを流し込めるようにする場所打ちコンクリート杭の構築方法、並びにトレミー管を提供する。【解決手段】地盤20に掘削した杭孔21に鉄筋かご24を建て込み、鉄筋かご24の内側にトレミー管1を立て込み、杭孔21の下部から順にコンクリート25を打設する。鉄筋かご24の上部近傍でコンクリート25を打設する際、トレミー管1を上下動させると管本体10に設けられたリング状突出部11が骨材26と接触し、コンクリート25が攪拌されて鉄筋かご24の外側までコンクリート25が流れ込む。【選択図】図7
TREMIE PIPE, AND CONSTRUCTION METHOD OF CONCRETE PILE
トレミー管及びコンクリート杭の構築方法
KASUYA YUKI (author)
2022-01-18
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen