A platform for research: civil engineering, architecture and urbanism
STEEL JOINT STRUCTURE IN STEEL CONCRETE STRUCTURE
To provide a steel joint structure in a steel concrete structure having superior workability as compared with the conventional one.SOLUTION: There is provided a steel joint structure that joins a first main steel material and a second main steel material in a steel concrete structure, including: a first perforated steel plate gibber rigidly joined to the main steel material; a second perforated steel plate gibber rigidly joined to the second main steel material; and concrete arranged to cover at least the first perforated steel plate gibber and the second perforated steel plate gibber. The first perforated steel plate gibber and the second perforated steel plate gibber are arranged so as to face each other at intervals. The first perforated steel plate gibber and the second perforated steel plate gibber are integrally joined via the concrete in a state of being buried in the concrete.SELECTED DRAWING: Figure 1
【課題】従来に比べて施工性の優れた鉄骨コンクリート構造体における鉄骨継手構造を提供する。【解決手段】鉄骨コンクリート構造体における第1主鋼材と第2主鋼材を接合する鉄骨継手構造であって、第1主鋼材に剛接合された第1の孔あき鋼板ジベルと、第2主鋼材に剛接合された第2の孔あき鋼板ジベルと、少なくとも第1の孔あき鋼板ジベルおよび第2の孔あき鋼板ジベルを被覆するように配置されたコンクリートと、を備え、第1の孔あき鋼板ジベル及び第2の孔あき鋼板ジベルが互いに対向且つ間隔をおいて配置され、第1の孔あき鋼板ジベル及び第2の孔あき鋼板ジベルがコンクリートに埋没した状態で当該コンクリートを介して一体に接合されている。【選択図】図1
STEEL JOINT STRUCTURE IN STEEL CONCRETE STRUCTURE
To provide a steel joint structure in a steel concrete structure having superior workability as compared with the conventional one.SOLUTION: There is provided a steel joint structure that joins a first main steel material and a second main steel material in a steel concrete structure, including: a first perforated steel plate gibber rigidly joined to the main steel material; a second perforated steel plate gibber rigidly joined to the second main steel material; and concrete arranged to cover at least the first perforated steel plate gibber and the second perforated steel plate gibber. The first perforated steel plate gibber and the second perforated steel plate gibber are arranged so as to face each other at intervals. The first perforated steel plate gibber and the second perforated steel plate gibber are integrally joined via the concrete in a state of being buried in the concrete.SELECTED DRAWING: Figure 1
【課題】従来に比べて施工性の優れた鉄骨コンクリート構造体における鉄骨継手構造を提供する。【解決手段】鉄骨コンクリート構造体における第1主鋼材と第2主鋼材を接合する鉄骨継手構造であって、第1主鋼材に剛接合された第1の孔あき鋼板ジベルと、第2主鋼材に剛接合された第2の孔あき鋼板ジベルと、少なくとも第1の孔あき鋼板ジベルおよび第2の孔あき鋼板ジベルを被覆するように配置されたコンクリートと、を備え、第1の孔あき鋼板ジベル及び第2の孔あき鋼板ジベルが互いに対向且つ間隔をおいて配置され、第1の孔あき鋼板ジベル及び第2の孔あき鋼板ジベルがコンクリートに埋没した状態で当該コンクリートを介して一体に接合されている。【選択図】図1
STEEL JOINT STRUCTURE IN STEEL CONCRETE STRUCTURE
鉄骨コンクリート構造体における鉄骨継手構造
MORI YOSHIKI (author) / IMANISHI HIDEKIMI (author) / OIKAWA TERUYASU (author) / NOMOTO KOSUKE (author) / HAYASHI KOICHI (author) / MIYAZAWA MASAHIRO (author) / OBARA TAKAYUKI (author) / MATSUBAYASHI TAKU (author) / YOSHIMOTO KATSUYA (author)
2022-01-27
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
steel plate concrete structure with joint assembly and joint structure
European Patent Office | 2017
|REINFORCED CONCRETE COLUMN/STEEL COLUMN/STEEL BEAM JOINT STRUCTURE
European Patent Office | 2016
|Steel structure concrete floor deformation joint node structure
European Patent Office | 2023
|