METHOD FOR PLACING DRAIN MATERIAL AND DRAIN MATERIAL PLACING DEVICE THEREFOR
To provide a method for placing drain material and a drain material placing device for use in the method, which can be efficiently and safely used in placing mainly short drain materials.SOLUTION: A suspension fixture 13 is provided at an upper end of drain material 1 of a predetermined length L. A wire 9 inserted into a mandrel 8 and pulled out from the lower end of the mandrel 8 is connected to the suspension fixture 13. After the drain material 1 is pulled into the mandrel 8 from below by the wire 9, an anchor member is secured to the lower end of the drain material 1. The mandrel 8 is penetrated into the ground A while the wire 9 is unrolled, and then the mandrel 8 is pulled out of the ground A to bury the drain material 1.SELECTED DRAWING: Figure 1
【課題】主に短尺のドレーン材の打設において効率よく施工でき、且つ、安全に作業を行うことができるドレーン材の打設方法及びそれに使用するドレーン材打設装置の提供。【解決手段】所定長さLのドレーン材1の上端部に吊り具13を設け、マンドレル8内に挿通され、先端がマンドレル8の下端より引き出されたワイヤ9を吊り具13に連結し、ワイヤ9でマンドレル8内にドレーン材1を下方から引き入れた後、ドレーン材1の下端にアンカー部材を係止させ、ワイヤ9を繰り出しつつマンドレル8を地盤Aに貫入し、しかる後、マンドレル8を地盤Aより引き抜くことによってドレーン材1を埋設する。【選択図】図1
METHOD FOR PLACING DRAIN MATERIAL AND DRAIN MATERIAL PLACING DEVICE THEREFOR
To provide a method for placing drain material and a drain material placing device for use in the method, which can be efficiently and safely used in placing mainly short drain materials.SOLUTION: A suspension fixture 13 is provided at an upper end of drain material 1 of a predetermined length L. A wire 9 inserted into a mandrel 8 and pulled out from the lower end of the mandrel 8 is connected to the suspension fixture 13. After the drain material 1 is pulled into the mandrel 8 from below by the wire 9, an anchor member is secured to the lower end of the drain material 1. The mandrel 8 is penetrated into the ground A while the wire 9 is unrolled, and then the mandrel 8 is pulled out of the ground A to bury the drain material 1.SELECTED DRAWING: Figure 1
【課題】主に短尺のドレーン材の打設において効率よく施工でき、且つ、安全に作業を行うことができるドレーン材の打設方法及びそれに使用するドレーン材打設装置の提供。【解決手段】所定長さLのドレーン材1の上端部に吊り具13を設け、マンドレル8内に挿通され、先端がマンドレル8の下端より引き出されたワイヤ9を吊り具13に連結し、ワイヤ9でマンドレル8内にドレーン材1を下方から引き入れた後、ドレーン材1の下端にアンカー部材を係止させ、ワイヤ9を繰り出しつつマンドレル8を地盤Aに貫入し、しかる後、マンドレル8を地盤Aより引き抜くことによってドレーン材1を埋設する。【選択図】図1
METHOD FOR PLACING DRAIN MATERIAL AND DRAIN MATERIAL PLACING DEVICE THEREFOR
ドレーン材の打設方法及びそれに使用するドレーン材打設装置
SASA SHINJI (author) / AKAGANE HIDETAKA (author) / SUZUKI TOSHIHARU (author) / ODERA MASASHI (author) / YAMAUCHI YOSHIFUMI (author) / UENO KAZUHIKO (author) / NGUYEN TANG THANH BINH (author) / ASADA HIDEYUKI (author) / TAGUCHI HIROBUMI (author) / ITO TAKESHI (author)
2022-02-18
Patent
Electronic Resource
Japanese