A platform for research: civil engineering, architecture and urbanism
RENEWAL METHOD OF FOLDED-PLATE ROOF, AND FOLDED-PLATE ROOF
To improve durability of a renewal structure of a folded-plate roof.SOLUTION: A renewal method of a folded-plate roof comprises an inspection step and an installation step. In the inspection step, quality of a state of a first folded-plate fixing member fixing a first folded-plate roof material below the first folded-plate roof material is inspected at a plurality of positions in the folded-plate roof. In the installation step, a second folded-plate roof material; a second folded-plate fixing member fixing the second folded-plate roof material below the second folded-plate roof material; and a support member supporting the second folded-plate fixing member are installed above the first folded-plate roof material. Of the folded-plate roof, as to a first area where the first folded-plate fixing member is determined to be in a defective state, a support member for a trough portion is installed above the trough portion of the first folded-plate fixing member and as to a second area where the first folded-plate fixing member is determined to be in a preferable state, a support member for a crest portion is installed above the crest portion of the first folded-plate fixing member.SELECTED DRAWING: Figure 7
【課題】折板屋根の更新構造の耐久性を向上させる。【解決手段】折板屋根の更新方法は、検査工程と設置工程とを備える。検査工程は、第1の折板屋根材の下方で第1の折板屋根材を固定する第1の折板固定部材の状態の良否を、折板屋根における複数の位置において検査する工程である。設置工程は、第2の折板屋根材と、第2の折板屋根材の下方で第2の折板屋根材を固定する第2の折板固定部材と、第2の折板固定部材を支持する支持部材と、を第1の折板屋根材の上方に設置する工程であり、折板屋根のうち、第1の折板固定部材が不良状態であると判定された第1の領域については、第1の折板固定部材の谷部の上方に谷部用の支持部材を設置し、かつ、第1の折板固定部材が良状態であると判定された第2の領域については、第1の折板固定部材の山部の上方に山部用の支持部材を設置する工程である。【選択図】図7
RENEWAL METHOD OF FOLDED-PLATE ROOF, AND FOLDED-PLATE ROOF
To improve durability of a renewal structure of a folded-plate roof.SOLUTION: A renewal method of a folded-plate roof comprises an inspection step and an installation step. In the inspection step, quality of a state of a first folded-plate fixing member fixing a first folded-plate roof material below the first folded-plate roof material is inspected at a plurality of positions in the folded-plate roof. In the installation step, a second folded-plate roof material; a second folded-plate fixing member fixing the second folded-plate roof material below the second folded-plate roof material; and a support member supporting the second folded-plate fixing member are installed above the first folded-plate roof material. Of the folded-plate roof, as to a first area where the first folded-plate fixing member is determined to be in a defective state, a support member for a trough portion is installed above the trough portion of the first folded-plate fixing member and as to a second area where the first folded-plate fixing member is determined to be in a preferable state, a support member for a crest portion is installed above the crest portion of the first folded-plate fixing member.SELECTED DRAWING: Figure 7
【課題】折板屋根の更新構造の耐久性を向上させる。【解決手段】折板屋根の更新方法は、検査工程と設置工程とを備える。検査工程は、第1の折板屋根材の下方で第1の折板屋根材を固定する第1の折板固定部材の状態の良否を、折板屋根における複数の位置において検査する工程である。設置工程は、第2の折板屋根材と、第2の折板屋根材の下方で第2の折板屋根材を固定する第2の折板固定部材と、第2の折板固定部材を支持する支持部材と、を第1の折板屋根材の上方に設置する工程であり、折板屋根のうち、第1の折板固定部材が不良状態であると判定された第1の領域については、第1の折板固定部材の谷部の上方に谷部用の支持部材を設置し、かつ、第1の折板固定部材が良状態であると判定された第2の領域については、第1の折板固定部材の山部の上方に山部用の支持部材を設置する工程である。【選択図】図7
RENEWAL METHOD OF FOLDED-PLATE ROOF, AND FOLDED-PLATE ROOF
折板屋根の更新方法および折板屋根
MATSUMURA KOJI (author) / KINOSHITA YOSHIHITO (author) / ISHIZAKI YUJI (author) / FURUIKE KAZUYOSHI (author)
2022-02-18
Patent
Electronic Resource
Japanese
FOLDED-PLATE ROOF CONSTRUCTION METHOD AND FOLDED-PLATE ROOF
European Patent Office | 2023
|FOLDED PLATE ROOF CONNECTING DEVICE AND FOLDED PLATE ROOF STRUCTURE
European Patent Office | 2018
|DRILL SCREW FOR FOLDED-PLATE ROOF AND FOLDED-PLATE ROOF METHOD
European Patent Office | 2019
|REPAIR METHOD FOR FOLDED-PLATE ROOF, FOLDED-PLATE ROOF, AND FIXTURE
European Patent Office | 2016
|