A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF SHED BUILDING IN RIVER MANAGEMENT FACILITY OR COASTAL PROTECTION FACILITY
To provide a new construction method of a shed building provided in a river management facility or a coastal protection facility.SOLUTION: A method of constructing a shed building provided in a river management facility or a coastal protection facility comprises the steps of: manufacturing an aluminum alloy attachment frame 40 sized to correspond to the size of one wall unit by one or a plurality of wall units 10 for each wall unit; attaching a predetermined outer wall panel 50 to the attachment frame at a site near an installation site of a shed building; lifting the attachment frame to which the outer wall panel is attached by a lifting device, moving the attachment frame in front of the wall unit, and arranging the attachment frame and the wall unit so that their surfaces overlap each other; and fixing and attaching the attachment frame with the outer wall panels to the wall unit by working from the inside of the shed building.SELECTED DRAWING: Figure 3
【課題】河川管理施設又は海岸保全施設に設けられる上屋建物の新規な施工方法を提供する。【解決手段】河川管理施設又は海岸保全施設に設けられる上屋建物の施工方法は、各壁ユニット10に対して、1枚または複数枚により1つの壁ユニットのサイズに対応するようにサイズ決めされたアルミニウム合金製のアタッチメントフレーム40を作製する工程と、上屋建物の設置場所付近の現場で、アタッチメントフレームに所定の外壁パネル50を取り付ける工程と、外壁パネルが取り付けられたアタッチメントフレームを吊り上げ装置で吊り上げて、壁ユニットの前に移動させ、アタッチメントフレームと壁ユニットが面同士で重なるように配置する工程と、外壁パネルが取り付けられたアタッチメントフレームを、上屋建物の内側からの作業により、壁ユニットに固定して取り付ける工程とを備える。【選択図】図3
CONSTRUCTION METHOD OF SHED BUILDING IN RIVER MANAGEMENT FACILITY OR COASTAL PROTECTION FACILITY
To provide a new construction method of a shed building provided in a river management facility or a coastal protection facility.SOLUTION: A method of constructing a shed building provided in a river management facility or a coastal protection facility comprises the steps of: manufacturing an aluminum alloy attachment frame 40 sized to correspond to the size of one wall unit by one or a plurality of wall units 10 for each wall unit; attaching a predetermined outer wall panel 50 to the attachment frame at a site near an installation site of a shed building; lifting the attachment frame to which the outer wall panel is attached by a lifting device, moving the attachment frame in front of the wall unit, and arranging the attachment frame and the wall unit so that their surfaces overlap each other; and fixing and attaching the attachment frame with the outer wall panels to the wall unit by working from the inside of the shed building.SELECTED DRAWING: Figure 3
【課題】河川管理施設又は海岸保全施設に設けられる上屋建物の新規な施工方法を提供する。【解決手段】河川管理施設又は海岸保全施設に設けられる上屋建物の施工方法は、各壁ユニット10に対して、1枚または複数枚により1つの壁ユニットのサイズに対応するようにサイズ決めされたアルミニウム合金製のアタッチメントフレーム40を作製する工程と、上屋建物の設置場所付近の現場で、アタッチメントフレームに所定の外壁パネル50を取り付ける工程と、外壁パネルが取り付けられたアタッチメントフレームを吊り上げ装置で吊り上げて、壁ユニットの前に移動させ、アタッチメントフレームと壁ユニットが面同士で重なるように配置する工程と、外壁パネルが取り付けられたアタッチメントフレームを、上屋建物の内側からの作業により、壁ユニットに固定して取り付ける工程とを備える。【選択図】図3
CONSTRUCTION METHOD OF SHED BUILDING IN RIVER MANAGEMENT FACILITY OR COASTAL PROTECTION FACILITY
河川管理施設又は海岸保全施設における上屋建物の施工方法
YASUMOTO KEIICHI (author) / CHIBA TETSUO (author)
2022-03-11
Patent
Electronic Resource
Japanese
SHED BUILDING IN RIVER MANAGEMENT FACILITY OR COAST PROTECTION FACILITY
European Patent Office | 2022
|Movable safety protection shed for building construction
European Patent Office | 2024
|Detachable shaping protection operation shed for house building construction
European Patent Office | 2021
|Facility Management - Building Lifecycle
Online Contents | 2002
|Facility Management - Building Lifecycle
Online Contents | 2002
|