CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE, AND UNDERGROUND STRUCTURE
To provide a construction method and the like of an underground structure capable of improving efficiency of construction work.SOLUTION: A construction method of a deep foundation includes: a step of arranging, in a vertical shaft 2 formed on the ground 1, outer steel frames 6 in a vertical direction, inner steel frames and outer steel frames 5 in a circumferential direction of the vertical shaft 2 and inner steel band frames 7; and a step of placing concrete in the vertical shaft 2. The inner steel band frames 7 are placed and fixed onto a cradle 71 attached to the outer steel frames 6. The outer steel frames 6 and the inner steel frames are fixed to an installation stand 3 provided at a bottom of the vertical shaft 2.SELECTED DRAWING: Figure 7
【課題】施工作業を効率化できる地下構造物の構築方法等を提供する。【解決手段】地盤1に形成した立坑2に、鉛直方向の外側鉄骨6、内側鉄骨、および、立坑2の周方向の外側帯鉄筋5、内側帯鉄筋7を配置する工程と、立坑2内にコンクリートを打設する工程と、により深礎基礎を構築する。内側帯鉄筋7は、外側鉄骨6に取り付けた架台71に固定して配置される。外側鉄骨6と内側鉄骨は、立坑2の底部に設けた設置台3に固定される。【選択図】図7
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE, AND UNDERGROUND STRUCTURE
To provide a construction method and the like of an underground structure capable of improving efficiency of construction work.SOLUTION: A construction method of a deep foundation includes: a step of arranging, in a vertical shaft 2 formed on the ground 1, outer steel frames 6 in a vertical direction, inner steel frames and outer steel frames 5 in a circumferential direction of the vertical shaft 2 and inner steel band frames 7; and a step of placing concrete in the vertical shaft 2. The inner steel band frames 7 are placed and fixed onto a cradle 71 attached to the outer steel frames 6. The outer steel frames 6 and the inner steel frames are fixed to an installation stand 3 provided at a bottom of the vertical shaft 2.SELECTED DRAWING: Figure 7
【課題】施工作業を効率化できる地下構造物の構築方法等を提供する。【解決手段】地盤1に形成した立坑2に、鉛直方向の外側鉄骨6、内側鉄骨、および、立坑2の周方向の外側帯鉄筋5、内側帯鉄筋7を配置する工程と、立坑2内にコンクリートを打設する工程と、により深礎基礎を構築する。内側帯鉄筋7は、外側鉄骨6に取り付けた架台71に固定して配置される。外側鉄骨6と内側鉄骨は、立坑2の底部に設けた設置台3に固定される。【選択図】図7
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE, AND UNDERGROUND STRUCTURE
地下構造物の構築方法および地下構造物
TOBARI MASATOSHI (author) / SATO TADAHIRO (author) / YANO KAZUMASA (author) / KOJIMOTO SHINICHIRO (author)
2022-05-09
Patent
Electronic Resource
Japanese
UNDERGROUND STRUCTURE AND CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE
European Patent Office | 2017
|CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE, AND UNDERGROUND STRUCTURE
European Patent Office | 2018
|CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2021
|