A platform for research: civil engineering, architecture and urbanism
WALL GIRDER DROPPING-IN JIG, AND WALL GIRDER DROPPING-IN METHOD USING THE SAME
To provide a wall girder dropping-in jig capable of reducing worker's labor and construction period which can smoothly perform a hanging and dropping-in work of a wall girder between reinforcement groups exposed in two comb-shaped rows and can be attached to and detached from tips of a plurality of exposed reinforcements at the same time, and to provide a wall girder dropping-in method using the same.SOLUTION: A wall girder dropping-in jig 1 comprises a pair of guide members 10, 10 mounted to tips of reinforcement groups 3 exposed in two comb-shaped rows to be used, in which the guide members 10, 10 each include: a plate-like guide portion 11 being slidably in contact with both side faces of a wall girder 2; and a mount portion 12 fixed to a rear face side of the guide portion 11 and mounted to the tips of the reinforcement groups 3. Also provided is a wall girder dropping-in method using the same.SELECTED DRAWING: Figure 1
【課題】 2列の櫛状に露出した鉄筋群の間に壁梁の吊り下げ落し込む作業を円滑に行うことができるとともに、複数の露出した複数の鉄筋の先端に同時に装着及び取り外しをすることでき、作業者の負担を減らして工期の短縮をすることが可能な壁梁落込治具及びそれを用いた壁梁落込方法を提供する。【解決手段】 2列の櫛状に露出した鉄筋群3の先端に装着して使用する一対の案内部材10、10を備えてなり、案内部材10、10は、壁梁2の両側面に対して摺接する板状のガイド部11と、ガイド部11の裏面側に固定され、鉄筋群3の先端に装着する装着部12と、を有する壁梁落込治具1及びそれを用いた壁梁落込方法。【選択図】 図1
WALL GIRDER DROPPING-IN JIG, AND WALL GIRDER DROPPING-IN METHOD USING THE SAME
To provide a wall girder dropping-in jig capable of reducing worker's labor and construction period which can smoothly perform a hanging and dropping-in work of a wall girder between reinforcement groups exposed in two comb-shaped rows and can be attached to and detached from tips of a plurality of exposed reinforcements at the same time, and to provide a wall girder dropping-in method using the same.SOLUTION: A wall girder dropping-in jig 1 comprises a pair of guide members 10, 10 mounted to tips of reinforcement groups 3 exposed in two comb-shaped rows to be used, in which the guide members 10, 10 each include: a plate-like guide portion 11 being slidably in contact with both side faces of a wall girder 2; and a mount portion 12 fixed to a rear face side of the guide portion 11 and mounted to the tips of the reinforcement groups 3. Also provided is a wall girder dropping-in method using the same.SELECTED DRAWING: Figure 1
【課題】 2列の櫛状に露出した鉄筋群の間に壁梁の吊り下げ落し込む作業を円滑に行うことができるとともに、複数の露出した複数の鉄筋の先端に同時に装着及び取り外しをすることでき、作業者の負担を減らして工期の短縮をすることが可能な壁梁落込治具及びそれを用いた壁梁落込方法を提供する。【解決手段】 2列の櫛状に露出した鉄筋群3の先端に装着して使用する一対の案内部材10、10を備えてなり、案内部材10、10は、壁梁2の両側面に対して摺接する板状のガイド部11と、ガイド部11の裏面側に固定され、鉄筋群3の先端に装着する装着部12と、を有する壁梁落込治具1及びそれを用いた壁梁落込方法。【選択図】 図1
WALL GIRDER DROPPING-IN JIG, AND WALL GIRDER DROPPING-IN METHOD USING THE SAME
壁梁落込治具及びそれを用いた壁梁落込方法
MATSUMOTO SHIGEKI (author)
2022-05-11
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pre-loading Girder Wall Structure using such Girder and Constructing Method of such Wall Structure
European Patent Office | 2023
|Engineering Index Backfile | 1965