TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
To provide a tower erection system and a tower erection installation method that can eliminate the need for an extensive construction yard when erecting long and heavy towers.SOLUTION: In a tower erection system 70 for erecting a tower T on a footing 18 of a foundation 10, a winch 30, a temporary post 40, and an L-shaped frame 20 in a side view are installed on the footing 11,18; the frame 20 is rotatably installed on the footing 18 with its corner part as a pin fulcrum 24; a wire 35 extending from the winch 30 is wound around a second sheave 62 provided in the frame 20 through a first sheave 61 provided in the temporary post 40 and is freely wound around the winch 30 via a third sheave 63 in the vicinity of the winch 30 through the first sheave 61; the tower T is mounted on the frame 20 in a tilting position; the frame 20 is rotated around the pin fulcrum 24 by the operation of the winch 30, and the tower T is erected.SELECTED DRAWING: Figure 1
【課題】長尺で重量のある搭体の立て起こしに際して、広範な施工ヤードを不要にできる、搭体の立て起こしシステムと搭体の立て起こし設置方法を提供する。【解決手段】基礎10のフーチング18の上に搭体Tを立て起こす、搭体の立て起こしシステム70であり、フーチング11,18に対して、ウインチ30と、仮設ポスト40と、側面視L型の架台20とが設置され、架台20はその隅角部をピン支点24としてフーチング18に回動自在に設置され、ウインチ30から延設するワイヤ35が、仮設ポスト40の備える第一シーブ61を介し、架台20の備える第二シーブ62に巻き回され、第一シーブ61を介し、ウインチ30の近傍の第三シーブ63を介してウインチ30に巻き取り自在に配設され、倒れ姿勢の架台20に搭体Tが搭載され、ウインチ30の作動により架台20がピン支点24を中心に回動して、搭体Tが立て起こされるようになっている。【選択図】図1
TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
To provide a tower erection system and a tower erection installation method that can eliminate the need for an extensive construction yard when erecting long and heavy towers.SOLUTION: In a tower erection system 70 for erecting a tower T on a footing 18 of a foundation 10, a winch 30, a temporary post 40, and an L-shaped frame 20 in a side view are installed on the footing 11,18; the frame 20 is rotatably installed on the footing 18 with its corner part as a pin fulcrum 24; a wire 35 extending from the winch 30 is wound around a second sheave 62 provided in the frame 20 through a first sheave 61 provided in the temporary post 40 and is freely wound around the winch 30 via a third sheave 63 in the vicinity of the winch 30 through the first sheave 61; the tower T is mounted on the frame 20 in a tilting position; the frame 20 is rotated around the pin fulcrum 24 by the operation of the winch 30, and the tower T is erected.SELECTED DRAWING: Figure 1
【課題】長尺で重量のある搭体の立て起こしに際して、広範な施工ヤードを不要にできる、搭体の立て起こしシステムと搭体の立て起こし設置方法を提供する。【解決手段】基礎10のフーチング18の上に搭体Tを立て起こす、搭体の立て起こしシステム70であり、フーチング11,18に対して、ウインチ30と、仮設ポスト40と、側面視L型の架台20とが設置され、架台20はその隅角部をピン支点24としてフーチング18に回動自在に設置され、ウインチ30から延設するワイヤ35が、仮設ポスト40の備える第一シーブ61を介し、架台20の備える第二シーブ62に巻き回され、第一シーブ61を介し、ウインチ30の近傍の第三シーブ63を介してウインチ30に巻き取り自在に配設され、倒れ姿勢の架台20に搭体Tが搭載され、ウインチ30の作動により架台20がピン支点24を中心に回動して、搭体Tが立て起こされるようになっている。【選択図】図1
TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
搭体の立て起こしシステムと搭体の立て起こし設置方法
NISHIDA YOSHIO (author) / WATANABE MASAYOSHI (author)
2022-05-20
Patent
Electronic Resource
Japanese