HYDRAULIC PIPELINE RENEWAL METHOD
To provide a hydraulic pipeline renewal method that allows reduction in the quantity of materials and equipment carried into a work site and reduction in preparation work, and allows improved work efficiency by dispensing with special work, thereby achieving great shortening of the construction term and cost reduction.SOLUTION: In a hydraulic pipeline renewal method, new steel pipes are installed by removing existing steel pipes 12 from a hydraulic pipeline 11 of a hydraulic power station 10. At a midway point of the hydraulic pipeline 11 in the longitudinal direction, at least upper half of the existing steel pipe 12 is removed from a part of the existing steel pipe 12 exposed to the ground to form an opening 21. Existing steel pipes 12a, 12b downstream and upstream from the opening 21 are divided in the circumferential direction and the axial direction of the existing steel pipes 12a, 12b, and then carried to the opening 21 and removed.SELECTED DRAWING: Figure 1
【課題】作業現場への資機材の搬入量を少なくすると共に、準備作業を削減し、特別な作業を不要にして作業の効率化を図り、大幅な工期短縮とコスト削減を可能とする水圧管路更新方法を提供する。【解決手段】水力発電所10の水圧管路11から既設鉄管12を除去して新規鉄管を設置する水圧管路更新方法であって、水圧管路11の長手方向の途中で、地上に露出している既設鉄管12の一部から少なくとも既設鉄管12の上半分が除去されて開口部21が形成され、開口部21より下流側及び上流側の既設鉄管12a、12bは、既設鉄管12a、12bの円周方向及び軸方向に分割されて、開口部21まで搬送されて除去される。【選択図】図1
HYDRAULIC PIPELINE RENEWAL METHOD
To provide a hydraulic pipeline renewal method that allows reduction in the quantity of materials and equipment carried into a work site and reduction in preparation work, and allows improved work efficiency by dispensing with special work, thereby achieving great shortening of the construction term and cost reduction.SOLUTION: In a hydraulic pipeline renewal method, new steel pipes are installed by removing existing steel pipes 12 from a hydraulic pipeline 11 of a hydraulic power station 10. At a midway point of the hydraulic pipeline 11 in the longitudinal direction, at least upper half of the existing steel pipe 12 is removed from a part of the existing steel pipe 12 exposed to the ground to form an opening 21. Existing steel pipes 12a, 12b downstream and upstream from the opening 21 are divided in the circumferential direction and the axial direction of the existing steel pipes 12a, 12b, and then carried to the opening 21 and removed.SELECTED DRAWING: Figure 1
【課題】作業現場への資機材の搬入量を少なくすると共に、準備作業を削減し、特別な作業を不要にして作業の効率化を図り、大幅な工期短縮とコスト削減を可能とする水圧管路更新方法を提供する。【解決手段】水力発電所10の水圧管路11から既設鉄管12を除去して新規鉄管を設置する水圧管路更新方法であって、水圧管路11の長手方向の途中で、地上に露出している既設鉄管12の一部から少なくとも既設鉄管12の上半分が除去されて開口部21が形成され、開口部21より下流側及び上流側の既設鉄管12a、12bは、既設鉄管12a、12bの円周方向及び軸方向に分割されて、開口部21まで搬送されて除去される。【選択図】図1
HYDRAULIC PIPELINE RENEWAL METHOD
水圧管路更新方法
IKEBE AKIRA (author) / HAMADA MINORU (author) / OCHIAI YASUO (author)
2022-06-24
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
British Library Conference Proceedings | 1997
|Online Contents | 1996
|PIPELINE STRUCTURE AND PIPELINE RENEWAL CONSTRUCTION METHOD
European Patent Office | 2023
|Pipeline System Renewal Technologies
British Library Conference Proceedings | 2003
|FOUNDATION PENETRATING SHEATH PIPE AND PIPELINE RENEWAL METHOD
European Patent Office | 2017
|