A platform for research: civil engineering, architecture and urbanism
CONCRETE STRUCTURE FORMWORK AND METHOD FOR MANUFACTURING CONCRETE STRUCTURE
To provide a concrete structure formwork and a method for manufacturing a concrete structure, that can reduce the number of construction days as compared with a conventional general method and can form a concrete structure having sufficient strength.SOLUTION: A concrete structure formwork 3A includes a main body portion made of concrete. The main body portion includes a first surface 3Aa, and a second surface located on the opposite side of the first surface 3Aa. A plurality of grooves 4 are formed on the first surface 3Aa. By using such concrete structure formwork 3A, it is possible to obtain a concrete structure in which the concrete structure formwork 3A and the concrete material are integrated as described above. Therefore, it is not necessary to carry out a step of removing the formwork after the concrete material constituting the concrete structure is solidified as in the conventional case.SELECTED DRAWING: Figure 3
【課題】従来の一般的な方法と比べて施工日数を短縮できるとともに、十分な強度を有するコンクリート構造体を形成することが可能なコンクリート構造体用型枠およびコンクリート構造体の製造方法を提供する。【解決手段】コンクリート構造体用型枠3Aは、コンクリート製の本体部を備える。本体部は、第1面3Aaと、当該第1面3Aaと反対側に位置する第2面とを含む。第1面3Aaには、複数の溝4が形成されている。このようなコンクリート構造体用型枠3Aを用いれば、上述のようにコンクリート構造体用型枠3Aとコンクリート材料とが一体化したコンクリート構造体を得ることができる。このため、従来のようにコンクリート構造体を構成するコンクリート材料が固化した後、型枠を除去する工程を実施する必要が無い。【選択図】図3
CONCRETE STRUCTURE FORMWORK AND METHOD FOR MANUFACTURING CONCRETE STRUCTURE
To provide a concrete structure formwork and a method for manufacturing a concrete structure, that can reduce the number of construction days as compared with a conventional general method and can form a concrete structure having sufficient strength.SOLUTION: A concrete structure formwork 3A includes a main body portion made of concrete. The main body portion includes a first surface 3Aa, and a second surface located on the opposite side of the first surface 3Aa. A plurality of grooves 4 are formed on the first surface 3Aa. By using such concrete structure formwork 3A, it is possible to obtain a concrete structure in which the concrete structure formwork 3A and the concrete material are integrated as described above. Therefore, it is not necessary to carry out a step of removing the formwork after the concrete material constituting the concrete structure is solidified as in the conventional case.SELECTED DRAWING: Figure 3
【課題】従来の一般的な方法と比べて施工日数を短縮できるとともに、十分な強度を有するコンクリート構造体を形成することが可能なコンクリート構造体用型枠およびコンクリート構造体の製造方法を提供する。【解決手段】コンクリート構造体用型枠3Aは、コンクリート製の本体部を備える。本体部は、第1面3Aaと、当該第1面3Aaと反対側に位置する第2面とを含む。第1面3Aaには、複数の溝4が形成されている。このようなコンクリート構造体用型枠3Aを用いれば、上述のようにコンクリート構造体用型枠3Aとコンクリート材料とが一体化したコンクリート構造体を得ることができる。このため、従来のようにコンクリート構造体を構成するコンクリート材料が固化した後、型枠を除去する工程を実施する必要が無い。【選択図】図3
CONCRETE STRUCTURE FORMWORK AND METHOD FOR MANUFACTURING CONCRETE STRUCTURE
コンクリート構造体用型枠およびコンクリート構造体の製造方法
HAYAKAWA YOSHIYUKI (author)
2022-06-30
Patent
Electronic Resource
Japanese
European Patent Office | 2021
|CONCRETE STRUCTURE MANUFACTURING METHOD AND FORMWORK STRUCTURE OF CONCRETE STRUCTURE
European Patent Office | 2018
|European Patent Office | 2018
|European Patent Office | 2018
|European Patent Office | 2017
|