A platform for research: civil engineering, architecture and urbanism
METHOD FOR REPAIRING EMBANKMENT SLOPE AND SLOPE STRUCTURE OF EMBANKMENT
To provide a method for repairing embankment slopes, which can be temporarily restored in a short period of time and can be integrated between large sandbags in the height direction.SOLUTION: The invention is a method for repairing an embankment slope for repairing a slope of an embankment. It comprises steps of arranging large sandbags in a staircase pattern after shaping a surface to be repaired into steps (S1, S2), laying a planar reinforcing material from a top to a bottom of the large sandbags piled up in a staircase so that they are in close contact with the surface (S3), fixing the upper and lower parts of the laid planar reinforcing material to the head of the rod-shaped reinforcing material driven toward the inside of the embankment (S4, S5), covering the large sandbag and the planar reinforcing material with a slope portion formed of a water-permeable material (S6).SELECTED DRAWING: Figure 1
【課題】短期間で仮復旧が行えるうえに、高さ方向の大型土のう間の一体化を図ることが可能な盛土斜面の修復方法を提供する。【解決手段】盛土の斜面を修復するための盛土斜面の修復方法である。そして、修復対象面を段切りに整形した後に大型土のうを階段状に配置する工程(S1,S2)と、階段状に積み上げられた大型土のうの最上段から最下段にかけて、表面に密着するように面状補強材を敷設する工程(S3)と、敷設された面状補強材の上部及び下部を、盛土内部に向けて打ち込まれた棒状補強材の頭部に固定する工程(S4,S5)と、大型土のう及び面状補強材を透水性材料によって形成された斜面部で覆う工程(S6)とを備えている。【選択図】図1
METHOD FOR REPAIRING EMBANKMENT SLOPE AND SLOPE STRUCTURE OF EMBANKMENT
To provide a method for repairing embankment slopes, which can be temporarily restored in a short period of time and can be integrated between large sandbags in the height direction.SOLUTION: The invention is a method for repairing an embankment slope for repairing a slope of an embankment. It comprises steps of arranging large sandbags in a staircase pattern after shaping a surface to be repaired into steps (S1, S2), laying a planar reinforcing material from a top to a bottom of the large sandbags piled up in a staircase so that they are in close contact with the surface (S3), fixing the upper and lower parts of the laid planar reinforcing material to the head of the rod-shaped reinforcing material driven toward the inside of the embankment (S4, S5), covering the large sandbag and the planar reinforcing material with a slope portion formed of a water-permeable material (S6).SELECTED DRAWING: Figure 1
【課題】短期間で仮復旧が行えるうえに、高さ方向の大型土のう間の一体化を図ることが可能な盛土斜面の修復方法を提供する。【解決手段】盛土の斜面を修復するための盛土斜面の修復方法である。そして、修復対象面を段切りに整形した後に大型土のうを階段状に配置する工程(S1,S2)と、階段状に積み上げられた大型土のうの最上段から最下段にかけて、表面に密着するように面状補強材を敷設する工程(S3)と、敷設された面状補強材の上部及び下部を、盛土内部に向けて打ち込まれた棒状補強材の頭部に固定する工程(S4,S5)と、大型土のう及び面状補強材を透水性材料によって形成された斜面部で覆う工程(S6)とを備えている。【選択図】図1
METHOD FOR REPAIRING EMBANKMENT SLOPE AND SLOPE STRUCTURE OF EMBANKMENT
盛土斜面の修復方法及び盛土の斜面構造
ABE KEITA (author) / MATSUMARU TAKAKI (author) / NAKAJIMA SUSUMU (author) / KASAHARA KOHEI (author)
2022-07-05
Patent
Electronic Resource
Japanese
Slope Repairing Methodologies in Railway Embankment
Springer Verlag | 2024
|EMBANKMENT SLOPE REINFORCING STRUCTURE AND EMBANKMENT SLOPE REINFORCING METHOD
European Patent Office | 2020
|