A platform for research: civil engineering, architecture and urbanism
To provide an anchor installation method that reduces labor in installation.SOLUTION: In a drilling step (S2), an anchor pipe is inserted into the ground while a hole is drilled into the ground with a bit. Then in an anchor pipe pulling up step (S3), the anchor pipe is moved in the pulling-out direction such that a forward end part of the anchor pipe is positioned halfway in the drilled hole. Then in a bit removal step (S4), the bit is removed from the anchor pipe. Then in an anchor rod insertion step (S6), an anchor rod is inserted into the anchor pipe from the ground and protrude the anchor rod into a solidifying agent input part. Then in a solidifying agent input step (S7), a solidifying agent is put into the solidifying agent input part. Then, in a cap-fixing step (S9), the anchor pipe and the anchor rod are connected such that the anchor rod fixed in the ground resists the pulling-out direction component of external force acting on the anchor pipe.SELECTED DRAWING: Figure 5
【課題】設置の手間を少なくするアンカー設置方法を提供する。【解決手段】掘削工程(S2)にて、ビットによって地中を掘削しつつアンカーパイプを地中に挿入する。次に、アンカーパイプ引き上げ工程(S3)にて、掘削孔の途中にアンカーパイプの前端部が位置するように、アンカーパイプを引き抜き方向に移動させる。次に、ビット取り外し工程(S4)にてアンカーパイプからビットを取り外す。次に、アンカーロッド挿入工程(S6)にて、アンカーパイプ内に地上からアンカーロッドを挿入すると共に、凝固剤注入部内にアンカーロッドを突出させる。次に、凝固剤投入工程(S7)にて凝固剤を凝固剤投入部に投入する。次に、キャップ固定工程(S9)にて、地中に固定されたアンカーロッドがアンカーパイプに作用する外力の引き抜き方向成分に対抗するようにアンカーパイプとアンカーロッドを接続する。【選択図】図5
To provide an anchor installation method that reduces labor in installation.SOLUTION: In a drilling step (S2), an anchor pipe is inserted into the ground while a hole is drilled into the ground with a bit. Then in an anchor pipe pulling up step (S3), the anchor pipe is moved in the pulling-out direction such that a forward end part of the anchor pipe is positioned halfway in the drilled hole. Then in a bit removal step (S4), the bit is removed from the anchor pipe. Then in an anchor rod insertion step (S6), an anchor rod is inserted into the anchor pipe from the ground and protrude the anchor rod into a solidifying agent input part. Then in a solidifying agent input step (S7), a solidifying agent is put into the solidifying agent input part. Then, in a cap-fixing step (S9), the anchor pipe and the anchor rod are connected such that the anchor rod fixed in the ground resists the pulling-out direction component of external force acting on the anchor pipe.SELECTED DRAWING: Figure 5
【課題】設置の手間を少なくするアンカー設置方法を提供する。【解決手段】掘削工程(S2)にて、ビットによって地中を掘削しつつアンカーパイプを地中に挿入する。次に、アンカーパイプ引き上げ工程(S3)にて、掘削孔の途中にアンカーパイプの前端部が位置するように、アンカーパイプを引き抜き方向に移動させる。次に、ビット取り外し工程(S4)にてアンカーパイプからビットを取り外す。次に、アンカーロッド挿入工程(S6)にて、アンカーパイプ内に地上からアンカーロッドを挿入すると共に、凝固剤注入部内にアンカーロッドを突出させる。次に、凝固剤投入工程(S7)にて凝固剤を凝固剤投入部に投入する。次に、キャップ固定工程(S9)にて、地中に固定されたアンカーロッドがアンカーパイプに作用する外力の引き抜き方向成分に対抗するようにアンカーパイプとアンカーロッドを接続する。【選択図】図5
ANCHOR INSTALLATION METHOD
アンカー設置方法
DOI MANABU (author)
2022-11-04
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
ANCHOR INSTALLATION TOOL, AND ANCHOR INSTALLATION METHOD USING THE SAME
European Patent Office | 2016
|ANCHOR PIN, INSTALLATION METHOD THEREOF AND ANCHOR PIN INSTALLATION STRUCTURE
European Patent Office | 2017
|