FLOOR TILE INSTALLATION METHOD AND HEIGHT ADJUSTMENT TOOL
To provide a floor tile installation method and a height adjustment tool allowing a construction period to be shortened.SOLUTION: A floor tile installation method for attaching floor tiles 4 on a concrete substrate 2 is provided, the method comprising the steps of: applying adhesive mortar 3 on the concrete substrate 2 and placing height adjustment tools 10 on the adhesive mortar 3 to adjust height of the floor tiles 4; installing the floor tiles 4 on the adhesive mortar 3; and leveling the floor tiles. The height adjustment tools 10 are configured by folding slender thin plates, each provided with contact parts 12 contacting rear surfaces of the floor tiles 4, support parts 13 contacting the concrete substrate 2, and adjustment parts 14 connecting the contact parts 12 and the support parts 13 to adjust spaces therebetween. The height adjustment tools 10 is a non-continuous annular body in a circular direction, of which a first end part 15 and a second end part 16 are separated apart from each other.SELECTED DRAWING: Figure 2
【課題】床タイル張り工法における工期短縮が可能となる。【解決手段】床タイル4をコンクリート下地2に張り付ける床タイル張り工法であって、コンクリート下地2上に貼代モルタル3を設けるとともに、貼代モルタル3に床タイル4の高さを調整する高さ調整具10を配置する工程と、床タイル4を貼代モルタル3上に設置する工程と、床タイル4の高さを揃える工程とを備える。高さ調整具10は、細長い薄板を折曲して構成され、床タイル裏面に接する接触部と12、コンクリート下地2に接触する支持部13と、接触部12と支持部13とを繋ぎ間隔を調整する調整部14とを備える。高さ調整具10は、周回方向に非連続の環状体であって、第1端部15と第2端部16とが離間している。【選択図】図2
FLOOR TILE INSTALLATION METHOD AND HEIGHT ADJUSTMENT TOOL
To provide a floor tile installation method and a height adjustment tool allowing a construction period to be shortened.SOLUTION: A floor tile installation method for attaching floor tiles 4 on a concrete substrate 2 is provided, the method comprising the steps of: applying adhesive mortar 3 on the concrete substrate 2 and placing height adjustment tools 10 on the adhesive mortar 3 to adjust height of the floor tiles 4; installing the floor tiles 4 on the adhesive mortar 3; and leveling the floor tiles. The height adjustment tools 10 are configured by folding slender thin plates, each provided with contact parts 12 contacting rear surfaces of the floor tiles 4, support parts 13 contacting the concrete substrate 2, and adjustment parts 14 connecting the contact parts 12 and the support parts 13 to adjust spaces therebetween. The height adjustment tools 10 is a non-continuous annular body in a circular direction, of which a first end part 15 and a second end part 16 are separated apart from each other.SELECTED DRAWING: Figure 2
【課題】床タイル張り工法における工期短縮が可能となる。【解決手段】床タイル4をコンクリート下地2に張り付ける床タイル張り工法であって、コンクリート下地2上に貼代モルタル3を設けるとともに、貼代モルタル3に床タイル4の高さを調整する高さ調整具10を配置する工程と、床タイル4を貼代モルタル3上に設置する工程と、床タイル4の高さを揃える工程とを備える。高さ調整具10は、細長い薄板を折曲して構成され、床タイル裏面に接する接触部と12、コンクリート下地2に接触する支持部13と、接触部12と支持部13とを繋ぎ間隔を調整する調整部14とを備える。高さ調整具10は、周回方向に非連続の環状体であって、第1端部15と第2端部16とが離間している。【選択図】図2
FLOOR TILE INSTALLATION METHOD AND HEIGHT ADJUSTMENT TOOL
床タイル張り工法および高さ調整具
TANAKA JUNJI (author)
2022-11-08