A platform for research: civil engineering, architecture and urbanism
SUPPORT BODY FOR TIMBERING, AND REMOVAL/INSTALLATION METHOD OF TIMBERING
To provide a support body for timbering and a removal/installation method of the timbering allowing removal of the timbering installed under a slab without demolition thereof, and allowing the removed timbering to be suitably reused.SOLUTION: A support body 20 for timbering comprises: an upper frame 21 suspended with a crane; a lower frame 22 vertically arranged with a space from the upper frame 21; a balances connecting member 23 connecting end parts of the same sides of the upper frame 21 and the lower frame 22 to each other; and a plurality of temporal support means 24 supported by the upper frame 21, wherein the timbering is supported by the lower frame 22 inserted under the timbering in a state the upper frame 21 is supported by a structure through the temporal support means 24.SELECTED DRAWING: Figure 3
【課題】スラブ下に設置された支保工を解体せずに効率よく撤去することができ、且つ、撤去した支保工を好適に再利用することができる支保工用支持体及び支保工の撤去、設置方法の提供。【解決手段】支保工用支持体20は、クレーンに吊り持ちされた上部フレーム21と、上部フレーム21と上下に間隔をおいて配置された下部フレーム22と、上部フレーム21と下部フレーム22との同一端部側を連結する天秤連結材23と、上部フレーム21に支持された複数の仮支持手段24とを備え、上部フレーム21が仮支持手段24を介して構造物に支持された状態で支保工下に挿し込まれた下部フレーム22に支保工が支持されるようにしたものである。【選択図】図3
SUPPORT BODY FOR TIMBERING, AND REMOVAL/INSTALLATION METHOD OF TIMBERING
To provide a support body for timbering and a removal/installation method of the timbering allowing removal of the timbering installed under a slab without demolition thereof, and allowing the removed timbering to be suitably reused.SOLUTION: A support body 20 for timbering comprises: an upper frame 21 suspended with a crane; a lower frame 22 vertically arranged with a space from the upper frame 21; a balances connecting member 23 connecting end parts of the same sides of the upper frame 21 and the lower frame 22 to each other; and a plurality of temporal support means 24 supported by the upper frame 21, wherein the timbering is supported by the lower frame 22 inserted under the timbering in a state the upper frame 21 is supported by a structure through the temporal support means 24.SELECTED DRAWING: Figure 3
【課題】スラブ下に設置された支保工を解体せずに効率よく撤去することができ、且つ、撤去した支保工を好適に再利用することができる支保工用支持体及び支保工の撤去、設置方法の提供。【解決手段】支保工用支持体20は、クレーンに吊り持ちされた上部フレーム21と、上部フレーム21と上下に間隔をおいて配置された下部フレーム22と、上部フレーム21と下部フレーム22との同一端部側を連結する天秤連結材23と、上部フレーム21に支持された複数の仮支持手段24とを備え、上部フレーム21が仮支持手段24を介して構造物に支持された状態で支保工下に挿し込まれた下部フレーム22に支保工が支持されるようにしたものである。【選択図】図3
SUPPORT BODY FOR TIMBERING, AND REMOVAL/INSTALLATION METHOD OF TIMBERING
支保工用支持体及び支保工の撤去、設置方法
ABE MASARU (author)
2023-01-17
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
TIMBERING INSTALLATION METHOD AND TIMBERING INSTALLATION DEVICE
European Patent Office | 2023
|