A platform for research: civil engineering, architecture and urbanism
To provide a reinforcement material capable of improving workability during installation and removal.SOLUTION: A reinforcement material 10 is connected to a pile 20 to be driven into the ground by a pile hammer 150. The reinforcement material 10 includes a bottom part 12 and auxiliary part 51. The bottom part 12 is connected to the top of the pile 20. The auxiliary part 51 assists the connection between the bottom part 12 and the top of the pile 20. The area of the bottom part 12 is larger than the area of the top of the pile. On the top of the pile 20, multiple pile joints 221 are provided for the pile hammer 150 to grip. The bottom part 12 has mounting holes 121 at positions corresponding to the pile connecting parts 221. The auxiliary part 51 and the bottom part 12 sandwich the top of the pile 20. The auxiliary part 51 has a holding part 511 that holds the connector 40 that penetrates the pile connecting part 221 and the mounting hole 121 to connect the pile 20 and the reinforcement material 10.SELECTED DRAWING: Figure 2
【課題】設置及び撤去の際の作業性を向上させる。【解決手段】補強材10は、杭打機150によって地中に打ち込まれる杭20に接続される。補強材10は、底部12と、補助部51とを備える。底部12は、杭20の頭頂部に接続される。補助部51は、底部12と杭20の頭頂部との接続を補助する。底部12の面積は、杭の頭頂部の面積より大きい。杭20の頭頂部には、杭打機150が掴むための複数の杭接続部221が設けられる。底部12は、杭接続部221に対応する位置に取付孔121を有する。補助部51及び底部12は、杭20の頭頂部を挟む。補助部51は、杭接続部221及び取付孔121を貫通して杭20と補強材10とを接続する接続具40を保持する保持部511を有する。【選択図】図2
To provide a reinforcement material capable of improving workability during installation and removal.SOLUTION: A reinforcement material 10 is connected to a pile 20 to be driven into the ground by a pile hammer 150. The reinforcement material 10 includes a bottom part 12 and auxiliary part 51. The bottom part 12 is connected to the top of the pile 20. The auxiliary part 51 assists the connection between the bottom part 12 and the top of the pile 20. The area of the bottom part 12 is larger than the area of the top of the pile. On the top of the pile 20, multiple pile joints 221 are provided for the pile hammer 150 to grip. The bottom part 12 has mounting holes 121 at positions corresponding to the pile connecting parts 221. The auxiliary part 51 and the bottom part 12 sandwich the top of the pile 20. The auxiliary part 51 has a holding part 511 that holds the connector 40 that penetrates the pile connecting part 221 and the mounting hole 121 to connect the pile 20 and the reinforcement material 10.SELECTED DRAWING: Figure 2
【課題】設置及び撤去の際の作業性を向上させる。【解決手段】補強材10は、杭打機150によって地中に打ち込まれる杭20に接続される。補強材10は、底部12と、補助部51とを備える。底部12は、杭20の頭頂部に接続される。補助部51は、底部12と杭20の頭頂部との接続を補助する。底部12の面積は、杭の頭頂部の面積より大きい。杭20の頭頂部には、杭打機150が掴むための複数の杭接続部221が設けられる。底部12は、杭接続部221に対応する位置に取付孔121を有する。補助部51及び底部12は、杭20の頭頂部を挟む。補助部51は、杭接続部221及び取付孔121を貫通して杭20と補強材10とを接続する接続具40を保持する保持部511を有する。【選択図】図2
REINFORCEMENT MATERIAL
補強材
TABATA TOSHIYUKI (author)
2023-02-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|