A platform for research: civil engineering, architecture and urbanism
SNOW STOPPING METAL FITTING, AND CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD USING THE SAME
To stably and rigidly fix a snow stopping metal fitting which prevents snow accumulating on a roof from slipping from an eaves edge to a cover roof material which repairs an existing roof material.SOLUTION: A snow stopping metal fitting 100 comprises: a fixing piece 110; and an erected portion 120 positioned at an eaves side of the fixing piece 110 when installed on a cover roof material 1010. The fixing piece 110 includes an engaged portion 114 inserted between an eaves side insertion piece 1010H of the cover roof material 1010 and a rear face side of an existing roof material 1000, to be engaged. The engaged portion 114 is inserted between the eaves side insertion piece 1010H of the cover roof material 1010 and the rear face side of the existing roof material 1000, and the fixing piece 110 is engaged.SELECTED DRAWING: Figure 1
【課題】屋根上に積もった雪が軒先から滑り落ちることを防止する雪止め金具を、既設屋根材を補修したカバー屋根材に安定して強固に固定する。【解決手段】雪止め金具100は、固定片110と、カバー屋根材1010に設置された際に、固定片110より軒側に位置する立上部120とを備える。固定片110は、カバー屋根材1010の軒側挿入片1010Hと既設屋根材1000の裏面側との間に挿入されて係止される係止部114を含む。この係止部114が、カバー屋根材1010の軒側挿入片1010Hと既設屋根材1000の裏面側との間に挿入されて、固定片110が係止される。【選択図】図1
SNOW STOPPING METAL FITTING, AND CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD USING THE SAME
To stably and rigidly fix a snow stopping metal fitting which prevents snow accumulating on a roof from slipping from an eaves edge to a cover roof material which repairs an existing roof material.SOLUTION: A snow stopping metal fitting 100 comprises: a fixing piece 110; and an erected portion 120 positioned at an eaves side of the fixing piece 110 when installed on a cover roof material 1010. The fixing piece 110 includes an engaged portion 114 inserted between an eaves side insertion piece 1010H of the cover roof material 1010 and a rear face side of an existing roof material 1000, to be engaged. The engaged portion 114 is inserted between the eaves side insertion piece 1010H of the cover roof material 1010 and the rear face side of the existing roof material 1000, and the fixing piece 110 is engaged.SELECTED DRAWING: Figure 1
【課題】屋根上に積もった雪が軒先から滑り落ちることを防止する雪止め金具を、既設屋根材を補修したカバー屋根材に安定して強固に固定する。【解決手段】雪止め金具100は、固定片110と、カバー屋根材1010に設置された際に、固定片110より軒側に位置する立上部120とを備える。固定片110は、カバー屋根材1010の軒側挿入片1010Hと既設屋根材1000の裏面側との間に挿入されて係止される係止部114を含む。この係止部114が、カバー屋根材1010の軒側挿入片1010Hと既設屋根材1000の裏面側との間に挿入されて、固定片110が係止される。【選択図】図1
SNOW STOPPING METAL FITTING, AND CONSTRUCTION STRUCTURE AND CONSTRUCTION METHOD USING THE SAME
雪止め金具、それを用いた施工構造および施工方法
HATTORI TAKASHI (author)
2023-02-16
Patent
Electronic Resource
Japanese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
METAL FITTING FOR ROOF AND SNOW STOPPING METAL FITTING FOR ROOF
European Patent Office | 2019
|