A platform for research: civil engineering, architecture and urbanism
DREDGE CONSTRUCTION MANAGEMENT SYSTEM AND DREDGE CONSTRUCTION MANAGEMENT METHOD
To stably perform pump dredge with high accuracy and to reduce a workload regardless of skill and experience of an operator.SOLUTION: A dredge construction management system 10 includes: position measurement means 12 for measuring a position; a tide gauge 18 for measuring a tide level; a plurality of sensors 14 for measuring a posture; calculation management means 24 for managing calculation and information; and control means 28 for adjusting a depth and a position in a recessed path width direction of a cutter. The calculation management means 24 can be switched between a learning mode of recording an operation log related to an operation in manual dredge work and an automatic control mode of calculating control data transmitted to the control means 28 based on the operation log. Thus, since dredging can be performed while reproducing operation of skilled operators, pump dredge can be stably performed with high accuracy and a workload can be reduced regardless of skill and experience of an operator.SELECTED DRAWING: Figure 1
【課題】オペレータの技量や経験の如何に関わらず、ポンプ浚渫を安定して高精度に行うと共に、作業負担を軽減する。【解決手段】浚渫施工管理システム10は、位置を計測する位置計測手段12と、潮位を計測する潮位計18と、姿勢を計測する複数のセンサ14と、演算及び情報の管理を行う演算管理手段24と、カッターの深度及び凹路幅方向の位置を調整する制御手段28とを含み、演算管理手段24は、手動浚渫作業時の操作に係る操作ログを記録する学習モードと、操作ログに基づいて制御手段28へ送信する制御データを算出する自動制御モードとに切り替え可能に構成されている。これにより、熟練オペレータの操作を再現しながら浚渫することができるため、オペレータの技量や経験の如何に関わらず、ポンプ浚渫を安定して高精度に行うことが可能となり、また、作業時の負担を軽減することができる。【選択図】図1
DREDGE CONSTRUCTION MANAGEMENT SYSTEM AND DREDGE CONSTRUCTION MANAGEMENT METHOD
To stably perform pump dredge with high accuracy and to reduce a workload regardless of skill and experience of an operator.SOLUTION: A dredge construction management system 10 includes: position measurement means 12 for measuring a position; a tide gauge 18 for measuring a tide level; a plurality of sensors 14 for measuring a posture; calculation management means 24 for managing calculation and information; and control means 28 for adjusting a depth and a position in a recessed path width direction of a cutter. The calculation management means 24 can be switched between a learning mode of recording an operation log related to an operation in manual dredge work and an automatic control mode of calculating control data transmitted to the control means 28 based on the operation log. Thus, since dredging can be performed while reproducing operation of skilled operators, pump dredge can be stably performed with high accuracy and a workload can be reduced regardless of skill and experience of an operator.SELECTED DRAWING: Figure 1
【課題】オペレータの技量や経験の如何に関わらず、ポンプ浚渫を安定して高精度に行うと共に、作業負担を軽減する。【解決手段】浚渫施工管理システム10は、位置を計測する位置計測手段12と、潮位を計測する潮位計18と、姿勢を計測する複数のセンサ14と、演算及び情報の管理を行う演算管理手段24と、カッターの深度及び凹路幅方向の位置を調整する制御手段28とを含み、演算管理手段24は、手動浚渫作業時の操作に係る操作ログを記録する学習モードと、操作ログに基づいて制御手段28へ送信する制御データを算出する自動制御モードとに切り替え可能に構成されている。これにより、熟練オペレータの操作を再現しながら浚渫することができるため、オペレータの技量や経験の如何に関わらず、ポンプ浚渫を安定して高精度に行うことが可能となり、また、作業時の負担を軽減することができる。【選択図】図1
DREDGE CONSTRUCTION MANAGEMENT SYSTEM AND DREDGE CONSTRUCTION MANAGEMENT METHOD
浚渫施工管理システム及び浚渫施工管理方法
TAKEUCHI KATSUMASA (author) / NOBETA ATSUHIKO (author) / KUSAKARI SHIGENAO (author)
2023-03-14
Patent
Electronic Resource
Japanese
IPC:
E02F
Baggern
,
DREDGING
Online Contents | 2003
Engineering Index Backfile | 1909
|Harrietville dredge construction proceeds
Engineering Index Backfile | 1941
NJ's COAST Dredge Material Management Team Details Dredge Plan
Online Contents | 1995
Dredge construction at Dayton Nev
Engineering Index Backfile | 1921
|